Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: netbudy65

OG0-093 TOGAF 9.2 Combined Part 1 and Part 2 Questions and Answers

Questions 4

Which of the following does TOGAF describe as "a formal description of a system, or a detailed plan of the system at component level to guide its implementation"?

Options:

A.

Architecture

B.

Artifact

C.

Deliverable

D.

Model

E.

View

Buy Now
Questions 5

In which part of the ADM cycle do the earliest building block definitions start as abstract entities?

Options:

A.

Phase A

B.

Preliminary Phase

C.

Phases B, C, and D

D.

Phases G and H

E.

Phases E and F

Questions 6

What technique does TOGAF recommend for evaluating the status of an organization to undergo change?

Options:

A.

Business Transformation Readiness Assessment

B.

Business Value Assessment Technique

C.

Capability-Based Planning

D.

Communications and Stakeholder Management

E.

Gap Analysis

Buy Now
Questions 7

Complete the sentence. A set of architecture principles that cover every situation perceived throughout the enterprise meet the recommended criteria of__________.

Options:

A.

completeness

B.

robustness

C.

stability

D.

consistency

E.

understandability

Buy Now
Questions 8

When determining the requirements for enterprise architecture work in the Preliminary Phase, which of the following is not a business imperative that should be considered?

Options:

A.

Business requirements

B.

Cultural aspirations

C.

Forecast financial requirements

D.

Strategic Intent

E.

Technical elegance

Buy Now
Questions 9

Which of the following is a technique recommended by TOGAF to help identify and understand requirements?

Options:

A.

Architecture Maturity Models

B.

Business Scenarios

C.

Gap Analysis

D.

Mind Maps

E.

SWOT Analysis

Buy Now
Questions 10

Which section of the TOGAF template for Architecture Principles highlights the requirements for carrying out the principle?

Options:

A.

Implications

B.

Name

C.

Rationale

D.

Statement

Buy Now
Questions 11

According to TOGAF, where should architecture governance artifacts be stored?

Options:

A.

In the Integrated Information Infrastructure Reference Model

B.

In the Standards Information Base

C.

In the Foundation Architecture

D.

In the Architecture Repository

Buy Now
Questions 12

According to TOGAF, when creating views for a particular architecture, what is the recommended first step?

Options:

A.

Design a viewpoint to address all stakeholder concerns

B.

Develop views for the target architecture first

C.

Ensure completeness of the architecture

D.

Refer to existing libraries of viewpoints, to identify one for re-use

Buy Now
Questions 13

Which ADM phase establishes the connection between the architecture organization and the implementation organization through the Architecture Contract?

Options:

A.

Phase E

B.

Phase F

C.

Phase G

D.

Phase H

E.

Requirements Management

Buy Now
Questions 14

Which of the following best describes the purpose of the Statement of Architecture Work?

Options:

A.

It contains an assessment of the current architecture requirements

B.

It defines the scope and approach to complete an architecture project

C.

It is sent from the sponsor and triggers the start of an architecture development cycle

D.

It provides a high-level aspirational view of the end architecture project

E.

It provides a schedule for implementation of the target architecture

Buy Now
Questions 15

Which one of the following best describes the purpose of a Change Request?

Options:

A.

To act as a deliverable container for artifacts created during a project

B.

To request a dispensation or to kick-start a further cycle of architecture work

C.

To ensure that information is communicated to the right stakeholder at the right time

D.

To review project progress and ensure the implementation is inline with the objectives

E.

To ensure that the results of a Compliance Assessment are distributed to the Architecture Board

Buy Now
Questions 16

According to TOGAF, which of the following activities is described as part of the approach in the Preliminary Phase of the ADM?

Options:

A.

Creating the Architecture Vision deliverable

B.

Defining a set of Architecture Principles

C.

Developing an Architecture Contract

D.

Extending the business scenario with business modeling

E.

Preparing a consolidated Gap Analysis

Buy Now
Questions 17

Which of the following statements best describes risk management in the ADM?

Options:

A.

Risk analysis is best conducted in the Architecture Vision phase so that the risk is eliminated in subsequent phases

B.

Risk analysis should be carried out first in the Migration Planning phase

C.

Risk analysis is outside the scope of enterprise architecture projects

D.

Risk is pervasive in all enterprise architecture activity and should be managed in all phases of the ADM

E.

The only risks that are within the scope of enterprise architecture are technological risks

Buy Now
Questions 18

Which of the following best describes the Integrated Information Infrastructure Reference Model?

Options:

A.

It is used to determine the capability level of an enterprise

B.

It is a deliverable from Phase A

C.

It focuses on Application Software

D.

It provides a conceptual structure for architecture governance

E.

It supports all the Common Systems Architectures

Buy Now
Questions 19

Which pair of the following responses best completes the sentence? Architecture building blocks

____, whereas Solution Building blocks ____

Options:

A.

are assembled; are single function components

B.

are single function components; are groups of architecture building blocks

C.

are reusable; are not reusable

D.

define the architecture; provide the existing legacy system

E.

define functionality; define the implementation of functionality

Buy Now
Questions 20

Which one of the following classes of information within the Architecture Repository would typically contain a list of the applications in use within the enterprise?

Options:

A.

Reference Library

B.

Architecture Metamodel

C.

Architecture Landscape

D.

Governance Log

Buy Now
Questions 21

Which of the following best describes the TOGAF classification in Phase H for a re-architecting change?

Options:

A.

A change driven by a requirement to derive additional value from the existing investment

B.

A change driven by a requirement to increase investment in order to create new value for exploitation

C.

A change driven by a requirement to reduce costs

D.

A change driven by a requirement to reduce investment

E.

A change driven by a requirement to re-align with the business strategy

Buy Now
Questions 22

Which of the following statements about TOGAF Building Blocks is true?

Options:

A.

A good Building Block should not be composed of other Building Blocks

B.

Architecture Building Blocks should be first selected in Phase D

C.

Building Block specifications should be loosely coupled to implementation

D.

Custom developments are known as Architecture Building Blocks

Buy Now
Questions 23

Which phase of the ADM is an on-going activity that is visited throughout a TOGAF architecture project?

Options:

A.

Architecture Change Management

B.

Implementation governance

C.

Migration planning

D.

Preliminary Phase

E.

Requirements Management

Buy Now
Questions 24

Which one of the following is the practice by which the enterprise architecture and other architectures are managed and controlled at an enterprise level?

Options:

A.

Architecture governance

B.

Corporate governance

C.

IT governance

D.

Technology governance

E.

The program management office

Buy Now
Questions 25

TOGAF provides guidelines on how to use the ADM to establish an architecture capability. Which one of the following is NOT a correct guideline?

Options:

A.

Use the same approach as with any other capability

B.

Regard the establishment as an ongoing practice

C.

Apply the ADM with the specific vision to establish the practice

D.

Treat the establishment as a one-off project

Buy Now
Questions 26

Which of the following best describes the class of information known as the Reference Library within the Architecture Repository?

Options:

A.

A description of the organization specific architecture framework and method

B.

A record of the governance activity across the enterprise

C.

Guidelines and templates used to create new architectures

D.

Processes to support governance of the Architecture Repository

E.

Specifications to which architectures must conform

Buy Now
Questions 27

Which statement about Requirements Management is most correct?

Options:

A.

The purpose of Requirements Management is to process change requests.

B.

Requirements Management is a step of all ADM Phases

C.

Requirements Management and stakeholder engagement are placed at the center of architecture development.

D.

Stakeholder requirements are captured once in Phase A and managed throughout the ADM cycle.

Buy Now
Questions 28

Complete the sentence. The purpose of the Preliminary Phase is to_______________.

Options:

A.

define the enterprise strategy

B.

describe the target architecture

C.

architect an Enterprise Architecture Capability

D.

identify the stakeholders and their requirements

Buy Now
Questions 29

What ADM Phase generates the initial complete version of the Architecture Roadmap?

Options:

A.

Phase A: Architecture Vision

B.

Phase E: Opportunities and Solutions

C.

Phase B: Business Architecture

D.

Phase D: Technology Architecture

E.

Phase F: Migration Planning

Buy Now
Questions 30

Complete the sentence. According to TOGAF, all of the following are responsibilities of an Architecture Board, except ______________________.

Options:

A.

Ensuring consistency between sub-architectures

B.

Ensuring flexibility of the enterprise architecture to meet business needs

C.

Improving the maturity of the organization's architecture discipline

D.

Monitoring of architecture contracts

E.

Preparing architecture review reports

Buy Now
Questions 31

Which of the following types of architecture defines technology standards for building blocks and reflects general computing requirements?

Options:

A.

Industry Architecture

B.

Transition Architecture

C.

Foundation Architecture

D.

Organization-Specific Architecture

E.

Common Systems Architecture

Buy Now
Questions 32

Complete the sentence. Two of the four architecture domains that are subsets of an overall Enterprise Architecture are Business and Technology, the other two are Application and _________

Options:

A.

Vision

B.

Transition

C.

Segment

D.

Capability

E.

Data

Buy Now
Questions 33

Scenario

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect for a chain of convenience stores. The stores operate 24 hours a day and 7 days a week and use cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.

The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.

An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF standard within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.

The CIO has stated that the following issues need to be addressed in the restructuring:

    They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.

    The architecture should focus on the needs of the business, not technology

    To remain competitive, new products and promotions must undergo market trials before deployment across the retail chain. Information systems must be able to manage changes and updates without undue delays.

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF standard, Architecture Principles chapter. You may need to refer to the Architecture Principles chapter, section 20.6 (located in Part III) within the reference text in order to answer this question.]

You have been asked to identify the most relevant architecture principles for the current situation.

Based on the TOGAF standard, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

Options:

A.

Requirements Based Change, Responsive Change Management, Data Trustee, Common Vocabulary and Data Definitions, Business Continuity

B.

IT Responsibility, Data Security, Ease of Use, Service Orientation, Common Use Applications

C.

Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management, Interoperability

D.

Data is Accessible, Data is Shared, Interoperability, Requirements Based Change, Control Technical Diversity

Buy Now
Questions 34

Which part of the TOGAF standard provides a full description of each architecture phase?

Options:

A.

Architecture Capability Framework

B.

Architecture Development Method

C.

ADM Guidelines and Techniques

D.

Enterprise Continuum & Tools

Buy Now
Questions 35

The TOGAF Architecture Capability Framework recommends use of an ADM cycle for establishing an architecture practice. In this scenario, which of the following would describe the organizational structure for the architecture practice?

Options:

A.

Technology Architecture

B.

Business Architecture

C.

Transition Architecture

D.

Application Architecture

E.

Data Architecture

Buy Now
Questions 36

In which phase of the ADM cycle do building blocks become implementation-specific?

Options:

A.

Business Architecture

B.

Data Architecture

C.

Architecture Vision

D.

Opportunities and Solutions

E.

Technology Architecture

Buy Now
Questions 37

Which of the following does the TOGAF ADM recommend for use in developing an Architecture Vision document?

Options:

A.

Architecture Principles

B.

Requirement Management

C.

Interoperability Analysis

D.

Business Scenarios

E.

Gap Analysis

Buy Now
Questions 38

Which of the following best describes an architectural change categorized as a re-architecting change?

Options:

A.

A change to re-align with the business strategy

B.

A change to increase investment in order to create new value for exploitation

C.

A change to reduce costs

D.

A change to derive additional value from the existing investment

Buy Now
Questions 39

Scenario:

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.

To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.

The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.

The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.

TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

B.

You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders1 requirements.

C.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.

D.

You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders' concerns.

Buy Now
Questions 40

Complete the sentence.

A good set of architecture principles that cover every situation perceived throughput the enterprise meet the recommended criteria of____

Options:

A.

understandability

B.

consistency

C.

stability

D.

completeness

E.

robustness

Buy Now
Questions 41

In which ADM phase is the Implementation and Migration Plan coordinated with other activities in the enterprise?

Options:

A.

Phase A

B.

Phase G

C.

Phase E

D.

Phase H

E.

Phase F

Questions 42

Which section of the TOGAF template for Architecture Principles should clearly state the impact to the business and consequences of adopting the principle?

Options:

A.

Implications

B.

Name

C.

Rationale

D.

Statement

Buy Now
Questions 43

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for the enterprise architecture team at a multinational company. The company has grown rapidly by acquisition and has inherited numerous supply chain processes and related IT systems. Several supply chain processes have had problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant processes and systems. The company will move to a "Just-in-time" supply chain management system so as to keep inventory costs low.

The TOGAF standard is used for internal Enterprise Architecture activities. This project is using an iterative approach for executing the Architecture Development Method (ADM).

At present, there are no particularly useful architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created.The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing supply chain management processes or systems.

The architecture development project has completed Phase A and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business, Application and Data Architectures. Key stakeholder concerns that should be addressed by these architectures include:

1. What groups of people should be involved in supply chain management-related business processes?

2. What non-supply chain management applications will need to be integrated with the new supply chain management applications?

3. What data will need to be shared?

Refer to the Scenario

[Note: You may need to refer to Chapter 35 of the reference text in order to answer this question.] You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the next iteration of Architecture development.

Based on TOGAF, which of the following is the best answer?

Options:

A.

In the next iteration of Architecture development, you would describe the Baseline Business Architecture with a Value Chain diagram and a Baseline Business Process catalog. You would describe the Baseline Data Architecture with a Data diagram. You would describe the Baseline Application Architecture with an Environment and Location diagram.

B.

In the next iteration of Architecture development, you would describe the Target Business Architecture with an Organization/Actor catalog, a Business Service/Function catalog and Data Lifecycle diagrams. You would describe the Target Application Architecture with an Application Interaction matrix and Application Communications diagrams.

C.

You would describe the Baseline Business Architecture with a Business Service/Function catalog, an Organization/Actor catalog and a Data Entity/Business Function matrix. You would describe the Baseline Data Architecture using a Data Entity/Data Component catalog. You would describe the Baseline Application Architecture with an Application/Function matrix.

D.

You would describe the Target Business Architecture with a Business Service/Function catalog, and a Business Interaction matrix. You would describe the Target Data Architecture with a Data Entity/Business Function matrix and an Application/Data matrix. You would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix.

Buy Now
Questions 44

Scenario:

Please read this scenario prior to answering the question

The ABC company is an international agricultural company exporting bulbs, flowers and seeds worldwide. It is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in over 60 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.

To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.

The company international operations are subject to various legal and regulatory requirements. In areas such as genetically modified seeds, governmental controls are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.

The Governing Board is concerned, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested information about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs. TOGAF 9 has been mandated as the guiding framework for the development and evolution of the Enterprise Architecture practice.

Refer to the Scenario

You have been appointed as the Lead Consultant.

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of all these parties.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

Depending on the nature of the architecture, a set of models should be created that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should be able to view the models to see that their concerns have been properly addressed.

B.

Each architecture activity should be developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed,

C.

A stakeholder map should be developed that allows the architects to define groups of stakeholders sharing common concerns. A set of views should then be defined that addresses the concerns for each group- Architecture models can then be created for each view to address the stakeholders' concerns.

D.

For those groups that have sufficient power and level of interest, a special report should be created that summarizes the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders' requirements.

Buy Now
Questions 45

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for a chain of convenience stores. The stores operate 24 hours a day and 7 days a week and use cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.

The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.

An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF standard within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.

The CIO has stated that the following issues need to be addressed in the restructuring:

    They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.

    The architecture should focus on the needs of the business, not technology

    To remain competitive, new products and promotions must undergo market trials and if these are successful, deployed across the retail chain. Information systems must be able to manage changes and updates without undue delays.

Refer to the Scenario

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF, Section 23.6. You may need to refer to Chapter 23 of the reference text in order to answer this question.]

You have been asked to identify the most relevant architecture principles for the current situation.

Based on TOGAF, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

Options:

A.

Interoperability, Data is Accessible, Data is Shared, Requirements Based Change, Control Technical Diversity

B.

Requirements Based Change, Business Continuity, Common Vocabulary and Data Definitions, Data Trustee, Responsive Change Management

C.

IT Responsibility, Data Security, Ease of Use, Service Orientation, Common Use Applications

D.

Interoperability, Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management

Buy Now
Questions 46

Scenario:

Please read this scenario prior to answering the question

You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.]

One of the earliest initiatives in the Enterprise Architecture program was the definition of a set of architecture principles. These now need to be updated to address the concerns raised.

You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

Common-use Applications, Control Technical Diversity, Ease of Use, Interoperability, Data is Shared, Data is Accessible, Data Security

B.

Business Continuity, Common-use Applications, Maximize Benefit to the Enterprise, Data is Shared, Data is Accessible, Data Security

C.

Technology Independence, Data Trustee, Information Management is Everybody's Business, IT Responsibility, Responsive Change Management

D.

Service-orientation, Responsive Change Management, Business Continuity, Data is Accessible, Data Security

Buy Now
Questions 47

Scenario:

Please read this scenario prior to answering the question

The ABC company is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The company Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9. At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

You are serving as the Lead Enterprise Architect of the newly-formed Common ERP Deployment architecture project team.

As the Common ERP Deployment architecture project team assembles for its initial meeting, many of the participants have voiced concerns about the sweeping scope of the initiative. Others are confident that they know a solution that will work. During the meeting, a number of alternative recommendations for how to proceed are put forward by members of the team.

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

The team should hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the characteristics of the architecture from the business requirements.

B.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary target Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

C.

The team should create Baseline and Target Architectures for each of the manufacturing plants. A gap analysis between the architectures will then validate the approach, and determine the Transition Architecture needed to achieve the target state.

D.

The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of requirements can be developed that will drive the evolution of the architecture.

Buy Now
Questions 48

During a TOGAF ADM cycle, an architecture is denoted as Version 10. What does this indicate?

Options:

A.

A draft, detailed architecture

B.

A formally reviewed, detailed architecture

C.

A formally reviewed, preliminary architecture

D.

A preliminary outline architecture

E.

A high-level outline architecture

Buy Now
Questions 49

Scenario

Please read this scenario prior to answering the Question

You have been appointed as a consultant to the Chief Enterprise Architect of a multinational pharmaceutical corporation. The corporation includes 30 subsidiary companies with operations in over 60 countries and products sold in over 125 countries. It has major research and development sites in over 45 locations worldwide.

The management team is deeply committed to ensuring that the corporation is a world leader in socially responsible pharmaceutical development with a business strategy that focuses on profitability through environmentally friendly operating processes as well as a commitment to disease eradication.

The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of prescription pharmaceutical products has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a clinical trial for a new regulated drug.

The Governing Board is concerned about the risks posed in this complex global environment. As a result the Chief Executive Officer (CEO) has appointed a Chief Compliance Officer (CCO) to be responsible for overseeing and managing compliance issues for the corporation. The CCO reports directly to the CEO.

The CCO has approved the expenditure of resources to establish an Enterprise Architecture program. He has requested to be informed about the status of projects that could impact regulatory compliance. He also wants the corporate legal staff and auditors to analyze all proposed architectures to ensure that they are within the legal guidelines for each country. In addition, the research organization should be able to see that the architecture is appropriate for its needs.

TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Chief Compliance Officer, legal staff, auditors and the research organization.

Based on TOGAF, which of the following is the best answer?

Options:

A.

You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders' concerns.

B.

You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

C.

You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders' requirements.

D.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.

Buy Now
Questions 50

Which of the following is the representation of a related set of concerns?

Options:

A.

Architecture view

B.

Architecture viewpoint

C.

Diagram

D.

Matrix

E.

Catalog

Buy Now
Questions 51

Which of the following best describes the purpose of the Architecture Roadmap?

Options:

A.

It lists work packages on a timeline showing progress towards the Target Architecture

B.

It contains an assessment of the current architecture requirements

C.

It provides for effective communication of the end architecture project to the stakeholders

D.

It forms the basis of a contractual agreement between the sponsor and the architecture organization

E.

It is sent from the sponsor and triggers the start of an architecture development cycle

Buy Now
Questions 52

Which of the following best describes the Standards Information Base?

Options:

A.

A repository area that defines the parameters, structures, and processes to support governance.

B.

A repository area that describes the organization specific architecture framework and methodologies.

C.

A repository area that provides guidelines, templates, and pattern used to create new architectures.

D.

A repository area that lists a set of specifications to which architectures must conform

E.

A repository area that provides a record of the governance activity across the enterprise.

Questions 53

Which of the following describes an objective of the Preliminary Phase?

Options:

A.

Ensure conformance requirements for the target architecture are defined

B.

Develop the Implementation and Migration Plan

C.

Operate the governance framework

D.

Establish the architecture governance processes

E.

Develop the Architecture Vision document

Questions 54

Please read this scenario prior to answering the question

Your role is that of an Enterprise Architect at an multinational company. The company

designs, manufactures and sells products worldwide. It has grown rapidly by

acquisition and has inherited numerous different business processes and related IT

systems. This has led in many instances to a duplication of resources.

The Chief Operating Officer (COO) has made the decision to consolidate and reduce

redundant business processes and IT systems in the sales operations. She has

committed to the CEO that the business will migrate to a set of standardized solutions

that will reduce costs and improve efficiency.

The Enterprise Architecture practice at the company has been assigned to manage

the project. At present, there are no architectural assets in the Architecture Repository

related to this initiative. All assets will need to be acquired, customized, or created

from scratch. The CIO, who is the project sponsor, has identified the need for a set of

commercial off the shelf package applications as candidates for the target. She has

also stated that she is not concerned about preserving the existing business

processes or IT systems within the sales operations.

Your team leader has asked you to assist with developing a response to the following

questions:

Which groups of users will use the different applications and IT systems?

How many licenses and type of licenses are needed for the packaged applications?

What level of support is needed for the users?

Where should the support center(s) be located?

What new capabilities will be required to support this business change?

How much will the migration cost?

This project is using an iterative approach for executing the TOGAF Architecture

Development Method. The architecture development project has completed the

Architecture Vision Phase. A set of packaged applications has been identified and is

being considered, the next iteration will include development of the Business and

Application Target Architectures.

Refer the Scenario.

[Note: You may need to refer to the Architectural Artifacts chapter, section 31.6

(located in Part IV) of the reference text in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and

diagrams to support the Architecture development.

Based on the TOGAF Standard, Version 9.2, which of the following is the best

answer?

Options:

A.

You would describe the Target Business Architecture with a Business

Interaction matrix, and a Business Service/Function catalog. You would

describe the Target Application Architecture with an Application Communication

diagram, an Application Interaction matrix and an Interface catalog.

B.

You would describe the Target Business Architecture with an

Organization/Actor catalog, a Business Service/Function catalog, and a

Capability/Organization matrix. You would describe the Target Application

Architecture with an Application Portfolio catalog and an Application/Function

matrix.

C.

You would describe the Target Business Architecture with a Business

Capability Map, a Location catalog, and an Organization/Actor catalog. You

would describe the Target Application Architecture with an

Application/Organization Matrix, and Application Migration diagram.

D.

You would describe the Target Business Architecture with a Business

Service/Function catalog, a Location catalog, and an Organization/Actor

catalog. You would describe the Target Application Architecture with an

Application Migration diagram, and an Application and User Location diagram.

Buy Now
Questions 55

Which part of TOGAF describes taxonomies for categorizing the outputs of architecture activity in terms of reuse?

Options:

A.

ADM Guidelines and Techniques

B.

Architecture Capability Framework

C.

Architecture Development Method

D.

Enterprise Continuum & Tools

Buy Now
Questions 56

Which phase of the TOGAF ADM is the first phase directly concerned with the planning for the implementation of the target architecture(s)?

Options:

A.

Phase D

B.

Phase E

C.

Phase F

D.

Phase G

E.

Phase H

Buy Now
Questions 57

Scenario

Please read this scenario prior to answering the Question

You are serving as the Lead Architect for an Enterprise Architecture project team within a multinational oil and gas corporation. It is organized into two major business groupings:

-Upstream operations which include exploration for crude oil and natural gas and operating the infrastructure necessary to deliver oil and gas to the market.

-Downstream operations which include the manufacturing, distribution and marketing activities for oil products and chemicals

Safety is a priority for the company, with the aim to ensure id causes zero harm to people and the environment. The company has to satisfy the regulatory requirements of each of the countries it operates in.

The downstream business generates a third of the company’s profits worldwide and includes more than 30,000 petrol stations and various oil refineries. In some countries it also includes oil refining, a retail station network, lubricants manufacture and marketing, industrial fuel and lubricants sales. The practice for the downstream business has been to operate locally managed by local “operating companies”.

The Governing Board is concerned about the risk posed by operating in this complex global environment with a large part of the downstream business represented by local operating companies. As a result, the Chief Executive Officer (CEO) has appointed a Chief Compliance Officer (CEO) to be responsible for overseeing and managing compliance issues for the corporation. The CCO reports directly to the CEO.

The CCO has approved the expenditure of resources to establish an Enterprise Architecture program, and has mandated the use of the TOGAF standard as the framework. He has requested to be informed about the status of downstream operations that could impact regulatory compliance. He also wants the corporate legal staff and auditors to analyze all proposed new downstream operations to ensure that they are within the legal guidelines for each country. In addition, the local operating companies should be able to see that the architecture is appropriate for their needs.

The architecture project team has worked within the sponsor to complete a detailed Request for Architecture Work providing the high level project description. As the project commences the next phase, the necessary approvals from corporate and line management have been …..

Refer to the Scenario

You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Chief Compliance Officer, legal staff, auditors and the local operating companies.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. A formal review should be held with the stakeholders to verify that their concerns have been properly addressed by the models.

B.

You recommend that an analysis of the stakeholders is undertaken, including development of a Stakeholder Map. This will allow the architectures to define groups of stakeholders who have common concerns. The concerns and relevant viewpoints should be defined for each group of stakeholders, and recorded in the Architecture Vision document.

C.

You recommend that the ArchiMate modeling language is used to create a set of models that can be applied uniformly across all architecture projects. Each architecture should then be defined based on this fixed set of models. All concerned parties can then examine the models to ensure that their needs have been addressed.

D.

You recommend that a Communications Plan be created to address the powerful and influential stakeholders. This plan should include a report that summarizes the key features of the architecture with respect to each location and reflect the stakeholders’ requirements. You will check with each stakeholder that their concerns are being addressed.

Buy Now
Questions 58

Which of the following is an objective of Phase G, Implementation Governance?

Options:

A.

Establish the resources for architecture governance

B.

Develop the Target Technology Architecture

C.

Ensure conformance for the target architecture

D.

Operate the governance framework

E.

Finalize the Implementation and Migration Plan

Questions 59

Please read this scenario prior to answering the question

Your role is an Enterprise Architect for a chain of convenience stores. Many of the stores

remain open 24 hours a day. Each store has a standardized retail solution using cloud-

based point-of-sale (POS) technology to manage sales and inventory. The cloud-based

systems collect real-time data to support ordering and product selection decisions

including the tailoring of product assortment based on sales history, customer

demographics as well as the short-term weather forecast.

The company has acquired a smaller competitor, that has similar product lines and

operates in a different geographic region. The CEO believes that a merger will enable

growth through combined offerings and cost savings. This growth includes market share,

geographic expansion, as well as product diversification. The decision has been taken to

quickly integrate the two organizations, including merging retail operations and systems.

The merger will replace duplicated systems with the standardized cloud-based point-of-

sale technology. One innovation that the competitor has deployed is the use of hand-

held tablets within stores, together with a suite of store management applications, and

this is to be adopted across the whole of the merged organization. It has been observed

that this has increased employee satisfaction due to the time savings this has brought

compared to the previous fixed screens used for data entry.

The company has a mature Enterprise Architecture practice based on the TOGAF

Standard, with the CEO and CIO as joint sponsors. A project is underway to manage the

merger of the operations and systems.

The CIO anticipates significant cost savings will be made by moving to the standardized

retail solution across the merged organization. The CIO has also stated that the staff

training for the hand-held tablets should be kept to a minimum due to the large number

of employees, which include a large proportion of part-time employees.

Refer to the Scenario

[Note: You should assume that the company has adopted the example set of principles

that are listed and defined in the TOGAF standard, Architecture Principles chapter. You

may need to refer to the Architecture Principles chapter, section 20.6 (located in Part III)

within the reference text in order to answer this question.]

You have been asked to identify the most relevant architecture principles for the current

situation.

Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

[Note: The ordering of the principles listed in each answer is not significant.]

Options:

A.

Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive

Change Management, Service Orientation

B.

Requirements Based Change, Responsive Change Management, Data Trustee,

Common Vocabulary and Data Definitions, Compliance with the Law

C.

Common Use Applications, Data is Shared, Data is Accessible, Ease of Use,

Business Continuity

D.

Data is Accessible, Data is Shared, Interoperability, Technology Independence,

Control Technical Diversity

Buy Now
Questions 60

Scenario:

Please read this scenario prior to answering the question

ABC LLC is a vacation property management firm that is growing through acquisition. It manages over 200 resort properties across North America. Many of the resort properties use the same internal IT systems that they used before they were acquired. Until recently, the only requirement that has been placed in each property is that they use a standard financial reporting system to report their financials ID the headquarters on a weekly basis.

The CEO has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the LLC property business by standardizing its operations across the network to provide consolidated financial, human resources, logistics, sales and marketing, and yield management. He has also stated that he expects results by the end of the current fiscal year.

These changes will provide the company with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key markets to improve yields.

The LLC has a mature enterprise architecture (EA) practice and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire firm, including detailed requirements and recommendations.

Based on the recommendations from the initial engagement, the company has embraced an Architecture Vision to adopt an enterprise application that is tailored to the needs of the hospitality industry.

Refer to the scenario

Your role is that of Chief Architect. You have been asked to recommend the best approach to take in this architecture engagement to realize the CEO's vision.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

Since the initial engagement has identified the need to change, you recommend that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

B.

Since the vision is well understood and the strategic architecture agreed, you recommend that the target architecture is defined first, followed by transition planning. This will ensure that the current inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial architecture engagement.

C.

You recommend that this engagement define the Technology Architecture first in order to assess the current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

D.

You recommend that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to help forecast future impacts.

Buy Now
Questions 61

What does the TOGAF standard provide to guide architectural activity within the enterprise in terms of structures, roles, responsibilities, and processes?

Options:

A.

Architecture Development Method

B.

Architecture Capability Framework

C.

Architecture Content Framework

D.

Enterprise Continuum

Buy Now
Questions 62

Which of the following best describes the TOGAF Architecture Development Method?

Options:

A.

A method for controlling change at an enterprise-wide level

B.

A method for developing an organization-specific architecture

C.

A method for managing architecture requirements

D.

A method for classifying architectures and solutions

E.

A method for creating an Architecture Repository

Buy Now
Questions 63

What does the TOGAF standard describe as a structure which can be used for developing a broad range of architectures?

Options:

A.

Architecture Viewpoint

B.

Work Package

C.

Metamodel

D.

Architecture Framework

E.

Deliverable

Buy Now
Questions 64

Scenario:

Please read this scenario prior to answering the Question

You are the Lead Architect for a firm that manufactures ball bearings used in industrial equipment applications. They have manufacturing operations in several cities in the United States, Germany, and the United Kingdom.

The firm has traditionally allowed each manufacturing plant to drive its own production planning systems. Each plant has its own custom Materials Requirements Planning, Master Production Scheduling, Bill of Materials, and Shop Floor Control systems.

"Just In Time" manufacturing techniques are used to minimize wastes caused by excessive inventory and work in process. The increasingly competitive business environment has compelled the firm to improve its business capability to be more responsive to the needs of industrial customers. To support this capability, the firm has decided to implement an Enterprise Resource Planning (ERP) solution that will enable it to better coordinate its manufacturing capacity to match the demands for its products across all plants. In addition, there are also new European regulations coming into force to which their manufacturing processes must conform in the next six months.

As part of the implementation process, the Enterprise Architecture (EA) department has begun to implement an architecture process based on TOGAF 9. The CIO is the sponsor of the activity. The Chief Architect has directed that the program should include formal modeling using the Architecture Content Framework and the TOGAF Content Metamodel. This will enable support for the architecture tooling that the firm uses for its EA program.

The Chief Architect has stated that in order to model the complex manufacturing process it will be necessary to model processes that are event-driven. Also, in order to consolidate applications across several data centers it will be necessary to model the location of IT assets. In particular, the end goal is to have the single ERP application running in a single data center.

Currently the project is in the Preliminary Phase, and the architects are tailoring the Architecture Development Method (ADM) and Architecture Content Framework to fit into the corporate environment.

Refer to the Scenario

You have been asked to recommend a response to the Chief Architect's request to tailor the TOGAF Content Metamodel.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

You recommend that the architecture team incorporate the Process Modeling and Infrastructure Consolidation extensions into their tailored Content Metamodel. As the environment is process-centric this will enable them to model the manufacturing processes and store information to support regulatory compliance. It also includes views useful for managing the consolidation of applications into a single data center.

B.

You recommend that the architecture team incorporate the Process Modeling and Governance extensions into their tailored Content Metamodel. This is suitable as this is a significant IT change that will impact its operational models. This will ensure that they include specific entities and attributes that will allow them to model the event-driven nature of the manufacturing processes more precisely.

C.

You recommend that the architecture team incorporates the Governance and Motivation Extensions into their tailored Content Metamodel. This would allow modeling of the target milestones they want to achieve with this consolidation of application to a single data center. These extensions will also enable demonstration of regulatory compliance for the manufacturing process.

D.

You recommend that the architecture team incorporates the Data and Services Extensions into their tailored Content Metamodel. This would allow modeling of the location of IT assets and ensure regulatory compliance for the manufacturing process. It will also allow for identification of redundant duplication of capability which will be needed for a successful consolidation to a single data center.

Buy Now
Questions 65

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario

During the initial meeting of the Common ERP Deployment architecture project team, a number of alternative recommendations for how to proceed are put forward by members of the team.

You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.

Based on TOGAF 9, which of the following is the best answer?

Options:

A.

The team should develop Baseline and Target Architectures for each of the manufacturing plants, ensuring that the views corresponding to selected viewpoints address key concerns of the stakeholders. A consolidated gap analysis between the architectures will then be used to validate the approach, and determine the capability increments needed to achieve the target state.

B.

The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

C.

The team should use stakeholder analysis to understand who has concerns about the initiative. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.

D.

The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of retirements will be developed that will drive the evolution of the architecture.

Buy Now
Questions 66

Scenario:

Please read this scenario prior to answering the question

Your role is that of Lead Enterprise Architect working at the headquarters of a fast food chain. The chain manages over 7500 restaurants across 33 countries. Each restaurant in the chain is an independently owned and operated franchise.

Many of the restaurants still use the first generation IT systems deployed over 10 years ago. The Chief Operating Officer (COO) of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business including providing its franchisees new support services to help them address the increasing competition from coffee shops. This is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.

The changes will help provide the chain with improved products, including healthier alternatives in the menu, and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.

The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.

In planning this change the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the COO’s vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.

Based on the recommendation from the initial study, the decision has been taken for the chain to adopt a packaged suite of integrated application that is tailored to the needs of the franchise.

Refer to the scenario.

You have been asked by the Chief Architect to propose the best approach for architecture development to realize the COO’s vision.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You propose that the target architecture is defined first by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

B.

You propose that the baseline Technology Architecture is defined first in order to assess current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.

C.

You propose that the target architecture is defined first followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

D.

You propose that the focus be placed on architecture definition, with emphasis on understanding the strategic change parameters. The requirements, drivers, issues and constraints for this engagement can then be identified. You would ensure that the target architecture addresses not functional requirements so as to ensure the target architecture is robust and secure.

Buy Now
Questions 67

Scenario

Please read this scenario prior to answering the Question

You are serving as an Enterprise Architect at a large aerospace company. It designs, manufactures and sells civil and military aviation products worldwide and manufactures in multiple countries both inside and outside of the European Union. The company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems.

Recently, several procurement processes, within the civil aviation business, have has problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant procurement processes and systems. He has committed to the CEO that the business will move to a "Just-in-time" procurement system so as to keep inventory costs low.

The TOGAF standard is used for internal Enterprise Architecture activities. At present, there are no architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing procurement processes or systems.

This project is using an iterative approach for executing the Architecture Development Method (ADM). The architecture development project has completed the Architecture Vision Phase and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business and Application Architectures.

Stakeholders concerns that should be addressed by these architectures include:

1. What groups of people should be involved in procurement-related business processes?

2. What applications will these groups use once the architecture development is complete?

3. What non-procurement applications will need to be integrated with the new procurement applications?

4. What are the dependences between the non-procurement and the new procurement applications?

Refer to the Scenario

[Note: You may need to refer to the Architectural Artifacts chapter, section 31.6 (located in Part IV) within the reference text in order to answer this question.]

You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the next iteration of Architecture development.

Based on the TOGAF standard, which of the following is the best answer?

Options:

A.

You would describe the Baseline Business Architecture with a Baseline Business Process catalog, and an Object lifecycle catalog. You would describe the Baseline Application Architecture with an Interface catalog and a Technology Portfolio catalog.

B.

You would describe the Baseline Business Architecture with an Organization/Actor catalog, and a Business Service/Function catalog, and a Data Entity/Business Function matrix. You would describe the Baseline Application Architecture with an Application Portfolio catalog and an Application/Function matrix.

C.

You would describe the Target Business Architecture with a Business Interaction matrix, and a Business Service/Function catalog. You would describe the Target Application Architecture with an Application Communication diagram, an Application/Organization matrix, an Application Interaction matrix and an Interface catalog.

D.

You would describe the Target Business Architecture with a Business Service/Function catalog, an Organization/Actor catalog, and Data Lifecycle diagrams. You would describe the Target Application Architecture with Application Communication diagrams, an Application Interaction matrix, and an Application Portfolio catalog.

Buy Now
Questions 68

Which of the following best describes the purpose of the Gap Analysis technique?

Options:

A.

To determine service levels for the architecture

B.

To establish quality metrics for the architecture

C.

To identify commercial building blocks to be purchased

D.

To identify missing functionality

E.

To validate nonfunctional requirements

Buy Now
Questions 69

Which phase of the ADM is used to finalize a set of transition architectures that will support implementation?

Options:

A.

Phase D

B.

Phase E

C.

Phase F

D.

Phase G

E.

Phase H

Buy Now
Questions 70

Which one of the following statements about the Requirements Management phase is true?

Options:

A.

All requirements fed into the phase are prioritized, and those of low priority are deferred until the next iteration of the ADM cycle

B.

The phase generates the requirements for a given ADM cycle using the Business Scenario technique

C.

The phase manages the flow of requirements, storing them, and feeding them in and out of the relevant ADM phases

D.

The phase operates like a waiting room, and all requirements fed in to the phase must be resolved by the end of the current ADM cycle

E.

The phase resolves the requirements that are fed into it from the other ADM phases

Buy Now
Questions 71

Which one of the following best describes an Architecture Compliance Review?

Options:

A.

A review of an architecture project against established criteria and business objectives

B.

A review of the readiness and ability of an organization to accept change

C.

A review of the organization’s ability to share information and services

D.

A review of the baseline and target architectures to identify gaps

E.

A review of the plans for enterprise transformation

Buy Now
Questions 72

In Phases B, C, and D which is the first step in each phase?

Options:

A.

Conduct formal stakeholder review

B.

Create Architecture Definition Document

C.

Define Roadmap components

D.

Perform gap analysis

E.

Select reference models, viewpoints and tools

Buy Now
Questions 73

Which of the following best describes the need for the ADM process to be governed?

Options:

A.

To enable development of reference architectures

B.

To enable a fast response to market changes

C.

To build a top-down, all-inclusive architecture description

D.

To permit the architecture domains to be integrated

E.

To verify that the method is being applied correctly

Buy Now
Questions 74

Complete the sentence. The Business Transformation Readiness Assessment technique is

primarily focused on ___

Options:

A.

determining if the organization is ready to accept change

B.

planning the migration steps needed to achieve the transformation

C.

ensuring that there are adequate trained developers and engineers to implement the solution

D.

ensuring that there is sufficient financial capacity to execute the desired transformation

E.

determining if there is adequate stakeholder support for the implementation process

Buy Now
Questions 75

Which of the following best describes the TOGAF Architecture Development Method?

Options:

A.

A process for managing architecture requirements

B.

A classification mechanism for architectures and solutions

C.

A process for managing and controlling change at an enterprise-wide level

D.

A view of the Architecture Repository

E.

A process for developing an organization-specific enterprise architecture

Buy Now
Questions 76

TOGAF Part VII, Architecture Capability Framework recommends use of an ADM cycle for establishing an architecture practice. In this scenario which architecture would describe the organizational structure for the architecture practice?

Options:

A.

Application Architecture

B.

Business Architecture

C.

Data Architecture

D.

Technology Architecture

E.

Transition Architecture

Buy Now
Questions 77

Refer to the table below:

Which ADM Phase(s) does this describe?

Options:

A.

Phase F

B.

Phase E

C.

Phase B, C and D

D.

Phase A

Buy Now
Questions 78

Complete the sentence. There are five criteria that distinguish a good set of principles: Understandable, Robust, Complete, Consistent and __________.

Options:

A.

Agile

B.

Dynamic

C.

Comprehensive

D.

Rational

E.

Stable

Buy Now
Questions 79

Which of the following identifies business units that possess capabilities, and which participate in value streams?

Options:

A.

Business Capability Map

B.

Value Stream Map

C.

Organization Map

D.

Information Map

Buy Now
Questions 80

What is an objective of ADM Phase G Implementation Governance?

Options:

A.

To develop the Target Technology Architecture

B.

To finalize the Implementation and Migration Plan

C.

To ensure conformance for the target architecture

D.

To establish the resources for architecture governance

E.

To provide continual monitoring of the governance framework

Buy Now
Questions 81

Which part of the TOGAF document describes an overview of typical architecture deliverables?

Options:

A.

ADM Guidelines and Techniques

B.

Architecture Capability Framework

C.

Architecture Content Framework

D.

Enterprise Continuum & Tools

E.

TOGAF Reference Models

Buy Now
Questions 82

Which section of the TOGAF template for Architecture Principles should highlight the business benefits for adhering to the principle?

Options:

A.

Implications

B.

Name

C.

Rationale

D.

Statement

Buy Now
Questions 83

Which one of the following lists the main components within the TOGAF Architecture Repository?

Options:

A.

OrganizationalMetamodel, Architecture Capability, Architecture Landscape, Best Practices, Reference Library, Compliance Strategy.

B.

ArchitectureMetamodel, Organizational Capability Model, Application Landscape, SIB, Reference Library, Governance Model.

C.

BusinessMetamodel, Architecture Capability, Architecture Landscape, SIB, Reference Library, Governance Log.

D.

ArchitectureMetamodel, Architecture Capability, Architecture Landscape, SIB, Reference Library, Governance Log.

Buy Now
Questions 84

Which of the following describes the Architecture Vision document?

Options:

A.

A description of individual change increments showing progression from the baseline to target architecture

B.

A detailed schedule for implementation of the target architecture

C.

A high level description of the baseline and target architectures

D.

A joint agreement between the development team and sponsor on the deliverables and quality of an architecture

E.

A set of rules and guidelines to support fulfilling the mission of the organization

Buy Now
Questions 85

According to TOGAF, the recommended dimensions used to define the scope of an architecture include all the following, except:

Options:

A.

Architecture Domains

B.

Enterprise Focus

C.

Level of Detail

D.

Subject Matter

E.

Time Period

Buy Now
Questions 86

Consider the following ADM phases objectives.

Which phase does each objective match?

Options:

A.

1F-2G-3G-4H

B.

1H-2F-3F-4G

C.

1G-2H-3H-4F

D.

1F-2G-3H-4H

Buy Now
Questions 87

According to TOGAF, who usually initiates a Request for Architecture Work?

Options:

A.

The architecture organization

B.

The CIO/CTO

C.

The corporate governance board

D.

The senior management

E.

The sponsoring organization

Buy Now
Questions 88

Which of the following describes an objective of Phase G: Implementation Governance?

Options:

A.

Finalize the Implementation and Migration Plan

B.

Establish the recourses for architecture governance

C.

Ensure conformance for the target architecture

D.

Operate the governance framework

E.

Develop the Target Technology Architecture

Buy Now
Questions 89

Which of the following statements does NOT correctly describe Architecture Principles?

Options:

A.

They are most effective when they are embraced and used across the organization

B.

They are based on enterprise principles

C.

They are detailed policies that prescribe behaviors and requirements

D.

Even though they may appear generic, they should be tailored to reflect an organization's culture and goals

Buy Now
Questions 90

Which of the following best describes the purpose of an architecture compliance review?

Options:

A.

To review the validity of a project's Architecture Vision

B.

To review a project for compliance to external laws and regulations

C.

To review a project against established architecture criteria and business objectives

D.

To ensure that stakeholder concerns are being addressed by a project

Buy Now
Questions 91

According to TOGAF, in which phase of the ADM should an initial assessment of business transformation readiness occur?

Options:

A.

Preliminary Phase

B.

Phase A

C.

Phase B

D.

Phase F

E.

Phase G

Buy Now
Questions 92

Which of the following best completes the sentence? The Architecture Repository __________________.

Options:

A.

is used to store different classes of architectural output created by the ADM

B.

is a categorization mechanism for classifying architecture and solution artifacts

C.

is a detailed model of architectural work products, including deliverables and artifacts

D.

is an architecture of generic functions and services

E.

is a set of resources to help establish an architecture capability within an organization

Buy Now
Questions 93

What are the following activities part of?

• Risk classification

• Risk identification

• Initial risk assessment

Options:

A.

Security Architecture

B.

Risk Management

C.

Phase G

D.

Phase A

Buy Now
Questions 94

Which of the following is defined by TOGAF as a representation of a system from the perspective of a related set of concerns?

Options:

A.

Architecture Building Block

B.

Capability Architecture

C.

Statement of Work

D.

View

E.

Viewpoint

Buy Now
Questions 95

What is an objective of the Preliminary Phase?

Options:

A.

To develop the Implementation and Migration Plan

B.

To establish the architecture governance process

C.

To ensure conformance requirements for the target architecture are defined

D.

To operate the governance framework

E.

To develop the Architecture Vision document

Buy Now
Questions 96

What document is used to initiate a TOGAF ADM cycle?

Options:

A.

Architecture Roadmap

B.

Statement of Architecture Work

C.

Architecture Landscape

D.

Request for Architecture Work

E.

Architecture Vision

Buy Now
Questions 97

Which of the following best describes ADM Requirements Management?

Options:

A.

Addressing and prioritizing architecture requirements

B.

Managing architecture requirements throughout the ADM cycle

C.

Developing requirements that deliver business value

D.

Reviewing business requirements

E.

Validating requirements between ADM phases

Questions 98

Complete the sentence. The four purposes that typically frame the planning horizon, depth and breadth of an Architecture Project, and the contents of the EA Repository are Strategy Portfolio._____________________

Options:

A.

Project, and Solution Delivery.

B.

Subordinate, and Superior Architecture.

C.

Segment, and End-to-end Target Architecture.

D.

Discreet, and Cohesive.

Buy Now
Exam Code: OG0-093
Exam Name: TOGAF 9.2 Combined Part 1 and Part 2
Last Update: Nov 21, 2024
Questions: 420

PDF + Testing Engine

$130

Testing Engine

$95

PDF (Q&A)

$80