L6M5 Strategic Programme Leadership Questions and Answers

Questions 4

A positive work culture can lead to which of the following benefits? Select all that apply

Options:

A.

lower levels of redundancy

B.

improved performance

C.

increased productivity

D.

higher levels of resistance to change

E.

higher retention

Buy Now
Questions 5

Which project management methodology outlines a process for closing a project?

Answer Options:

Options:

A.

Monte Carlo

B.

Critical Path

C.

MRP

D.

Prince2

Buy Now
Questions 6

What is the purpose of the Project Team at Glitter Kitten Ltd?

Answer Options:

Options:

A.

Critical Path Analysis

B.

Value Engineering

C.

Contract Negotiation

D.

Supply Chain Mapping

Buy Now
Questions 7

A person who disrupts progress and hinders culture change holds which type of power?

Answer Options:

Options:

A.

Dismissive

B.

Contrary

C.

Pessimistic

D.

Negative

Buy Now
Questions 8

Scenario:

Fin Inc is a consultancy organisation in the private sector, founded 10 years ago by CEO Geoff Davies, who runs a tight ship. Many employees are scared of Geoff, and there are rumours that he fires people for refusing overtime. Fin Inc is working with a new client on a shopping centre project led by the well-liked CFO. The client wants a flexible, collaborative contract with transparent cost-sharing.

    What type of organisational structure does Fin Inc have?

Options:

A.

power

B.

role

C.

task

D.

person

Buy Now
Questions 9

Jerry is responsible for starting a new construction project.

    His company wants to build a new Water Park on the outskirts of town.

    He has prepared a Statement of Need, outlining requirements and benefits.

    Senior Management has approved the project to move forward.

Q: What should be Jerry's next task?

Answer Options:

Options:

A.

Concept design – outlining how the water park would look and operate

B.

Feasibility study – looking in-depth at options available

C.

Project brief – creating a list of technical requirements

D.

Appointment of a construction manager to manage the project

Buy Now
Questions 10

XYZ is a large construction organization running five different projects. Each project has a specific type of contract and pricing mechanism.

Your task is to match the correct type of contract and pricing mechanism to each project.

Projects and Descriptions

    Project 1

      Description: Construction of an apartment block, where XYZ is responsible for both design and construction. Upon completion, ownership is transferred to the client.

      Pricing Mechanism: Based on past experience of similar projects.

Project 2

    Description: Facilities management for a 6-year period after construction. The budget is constantly adjusted due to industry volatility.

    Pricing Mechanism: Budget changes continuously over time.

Project 3

    Description: XYZ was involved from an early stage, but does not bear the design risk. The budget resets at the start of each new accounting period.

    Pricing Mechanism: The budget is refreshed periodically.

Project 4

    Description: XYZ is responsible for certain parts of the design and build, while another company handles other aspects. XYZ is paid upon milestone completion.

    Pricing Mechanism: Payment is milestone-based.

Project 5

    Description: Construction of a new toll bridge which will be operated by XYZ for the first 6 years post-construction. The pricing includes costs of raw materials, labor, and a profit margin.

    Pricing Mechanism: Costs plus profit.

Options:

Buy Now
Questions 11

KCJ Ltd is a public sector organisation planning five projects for the next financial year. Each project has a distinct cost estimation method and source of power for the project leader.

Your task is to match the correct cost estimation method and source of power to each project.

Project Descriptions

    Project 1

      Description: Budget estimation is calculated using an algorithm.

      Project Lead’s Power: Founder of the organisation.

Project 2

    Description: The Head of R&D (PhD in Data Science) is using costing from similar past projects to determine the budget.

    Project Lead’s Power: Expertise in Data Science.

Project 3

    Description: The project is led by a key stakeholder and involves creating a Bill of Materials. Costs are worked out item by item.

    Project Lead’s Power: Authority due to stakeholder influence.

Project 4

    Description: The Project Leader has calculated the base cost, most likely cost, and worst-case scenario.

    Project Lead’s Power: Has the authority to cancel the project at any time.

Project 5

    Description: The project leader is a well-liked Board Member who has selected a team he is comfortable with. He determined the budget based on his own research.

    Project Lead’s Power: Personal relationships with team members.

Options:

Buy Now
Questions 12

Giant Construction Company is working on five large-scale projects. Each project has a specific contract type and pricing mechanism.

Your task is to match the correct contract type and pricing mechanism to each project.

Project Descriptions

    Project 1

      Description: Giant is collaborating closely with the client to construct a hospital. The client has provided a cost estimate, and any savings will be shared between the parties. This contract is popular in the public sector due to its flexibility.

Project 2

    Description: This suite of contracts is known as the "rainbow suite". It is rigid, meaning no changes can be made after signing. The price was fixed at the date of signing.

Project 3

    Description: This international project involves the construction of wind turbines. The pricing mechanism calculates costs for each individual turbine.

Project 4

    Description: The most popular form of contract in construction, utilizing a Contract Administrator to ensure timely information flow. Since the scope was not clearly defined, Giant is working with the client on a cost-sharing basis plus a small profit margin.

Project 5

    Description: The project involves ICT services and software provision. Payments are linked to milestone completion during the project implementation phase.

Options:

Buy Now