Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: netbudy65

HPE0-S60 Delta - HPE Compute Solutions Questions and Answers

Questions 4

Your customer is trying to grow a VMware duster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed

Which tool should you use to troubleshoot the problem?

Options:

A.

HPE One View for VMware vCenter Server to verify if server profile template s property imported and registered

B.

vCenter Server to verify if an OS Bund Plans property defined and has ESXi image uploaded

C.

HPE OneView interface to import an existing cluster using the hypervisor cluster profile functionality.

D.

ILO interlace of a given HPE Synergy compute node to verify whether this node is registered within HPE Oneview.

Buy Now
Questions 5

A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?

Options:

A.

Brocade 32GB Fibre Channel Switch Module for HPE Synergy

B.

HPE virtual Connect SE 32 Gb FC Module for Synergy

C.

HPE Virtual Connect SE 100 Gb F32 Module tor Synergy

D.

HPE Synergy 12 Gb SAS Connection Module

Buy Now
Questions 6

Your customer has experience with utilization sampling for HPE Virtual Connect SE 100 Gb F32 Module for HPE Synergy. They have recently purchased HPE VC FC modules.

What must you be aware of regarding utilization sampling for the new modules?

Options:

A.

Utilization sampling for HPE VC FC modules must be enabled manually using CLI.

B.

For HPE VC FC modules, utilization sampling is always enabled and cannot be disabled

C.

For HPE VC FC modules, utilization sampling can be enabled once appropriate license is applied

D.

Utilization sampling works the same way tor any type of HPE Synergy interconnect modules

Buy Now
Questions 7

The proposal consists of.

- 3 HPE Synergy 12000 frames

- 6 HPE Composer 2 modules

- 2 HPE Virtual Connect SE 100 GO F32 Module

- 4 HPE Synergy 50 GO interconnect Link Module

Which statements about this proposed design are true? (Select two.)

Options:

A.

The selected interconnect modules do not provide the requested WWN virtualization

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules

C.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules

D.

FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added

E.

Remove 4 HPE Composer 2 modules from the design, as they are not required

Buy Now
Questions 8

Which statement about a new HPE SimpliVity deployment is true?

Options:

A.

New HPE SimpliVity deployments give customer flexible choice of hypervisor

B.

All new HPE SimpliVity models are based on AMD CPUs

C.

All new HPE SimpliVity models support deduplication and compression

D.

New HPE SimpliVity deployments are licensed per node not per physical socket

Buy Now
Questions 9

Your customer wants to compare HPE Superdome Flex with HPE Superdome Flex 280.

Which statement about these two systems is true?

Options:

A.

Only HPE Superdome Rex 280 can be managed using HPE OneView

B.

Only HPE Superdome Flex supports HPE Persistent Memory

C.

Only HPE Superdome Flex 280 can support multiple nPars

D.

Only HPE Superdome Flex supports 32 sockets and 48TB of memory

Buy Now
Questions 10

As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2

Why would you recommend this change?

Options:

A.

HPE Composer 1 running HPE OneView 5 2 or later can support only 12 frames within a single management nog

B.

HPE Composer 2 can support more than the maximum 21 frames that are supported with HPE Composer 1 and HPE OneView.

C.

HPE Composer 2 provides access to 105 interface that can be used for full management of HPE Composer 2 remotely

D.

HPE Composer 1 cannot support remote frames, which doubles the configuration and management procedures effort

Buy Now
Questions 11

Which statement about HPE Superdome Flex 280 is true?

Options:

A.

It supports 2 to 8 sockets in 2-socket increments.

B.

it cannot be managed using HPE OneView.

C.

It must be equipped with at least 768 GB of memory.

D.

It can support up to two nPars with an external RMC.

Buy Now
Questions 12

Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.

Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.

Options:

Buy Now
Questions 13

Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.

Which statement regarding this setup is true?

Options:

A.

Each compute node must have at least 768GB of memory installed

B.

Interconnect modules that provide SAS connectivity should be moved to the third fabric

C.

Each interconnect module in each fabric must be properly licensed in HPE OneView

D.

Compute nodes must have a second CPU installed to access the second fabric.

Buy Now
Questions 14

Which statement about HPE Apollo 2000 Gen10 Plus platform is true?

Options:

A.

It is equipped with HPE Persistent memory by default

B.

It can support a single processor only and up to 4 per chassis

C.

It is fully managed using HPE OneView including all connections

D.

It offers servers with AMD EPYC and Intel Xeon Scalable CPUs

Buy Now
Questions 15

Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.

When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.

What must be done to fix this issue?

Options:

A.

Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.

B.

To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.

C.

The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.

D.

Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

Buy Now
Questions 16

Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.

What should you do to resolve this issue?

Options:

A.

Disable deduplication for this volume at the array level

B.

Remove the offline disks using array management tools

C.

Install and configure MPIO on me Windows system

D.

Remove the offline disks using Windows Disk Management

Buy Now
Questions 17

Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.

Which statement about mixing different FLM modules is true?

Options:

A.

Existing 2-port FLM modules must be replaced with 4-port FLM modules

B.

A management ring can contain mixed frame link module configurations

C.

A management ring with mixed FLM modules cannot have more than 12 frames

D.

Mixing different FLM modules is allowed if all of them have the same firmware version

Buy Now
Questions 18

Refer to the exhibit.

Which statement about this logical JBOD is true?

Options:

A.

This logical JBOD can be connected to multiple systems to formulate a snared datastore.

B.

After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created

C.

After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done

D.

This logical JBOD can be presented to the compute nodes in a different frame.

Buy Now
Questions 19

You configured a vVoI datastore using HPE Storage integration Pack for VMware vCenter.

Which storage object should you check using SSMC to verify whether vVol datastore is configured property?

Options:

A.

App Volume Set

B.

Storage Container

C.

Virtual Volume Set

D.

virtual Volume

Buy Now
Questions 20

After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.

Put the steps on the left into the coned order on the right to perform this task.

Options:

Buy Now
Questions 21

Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.

Options:

Buy Now
Questions 22

Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster

You are preparing a proposal with the following components:

- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- an appropriate number of the vSphere Standard licenses for each compute node

- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options

Which statement about this proposal is true?

Options:

A.

One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM

B.

vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features

C.

2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup

D.

20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.

Buy Now
Questions 23

You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.

Put the steps to achieve this goal into the coned order in the answer area on the right.

Options:

Buy Now
Exam Code: HPE0-S60
Exam Name: Delta - HPE Compute Solutions
Last Update: Dec 3, 2024
Questions: 79

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99