Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules. HPE ProLiant Gen 10 servers and an MSA array.
Which statement about compatibility of the existing environment with the planned software components is true?
Your customer plans to deploy VMware ESXi 7.0 U2, and they are looking for a hardware platform that will allow them to use up to 24 TB of physical memory.
Which HPE compute system meets the customer's requirements?
Your customer is trying to grow a VMware cluster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed.
Which tool should you use to troubleshoot the problem?
Your customer plans to manage HPE Primera using HPE Oneview
Which storage management tasks can be completed using HPE OneView for this environment?
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster
You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options
Which statement about this proposal is true?
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives
The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE O3940 Storage Module with 40 SSDs - All required cables and options
Which statement about this request is true?
A junior architect designed a solution based on HPE Synergy that must meet the following requirements:
Support at least 30 HPE Synergy 480 Gen10 Plus compute modules
Interconnect modules must provide MAC and WWN virtualization
All HPE Synergy frames must formulate a single management entity
The management appliance should not be a single point of failure
Connectivity to FC array should be available to all compute nodesThe proposal consists of:
3 HPE Synergy 12000 frames
6 HPE Composer 2 modules
2 HPE Virtual Connect SE 100Gb F32 Module
4 HPE Synergy 50Gb Interconnect Link ModuleWhich statements about this proposed design are true? (Select two)
You configured a virtual machine cluster using the HPE Storage Integration Pack for VMware vCenter.
Click the option in the SSMC main menu that you can use to verify whether a virtual storage operation is properly created on HPE Primera or 3PAR.
Your customer reports that they cannot deploy HPE Synergy compute nodes using HPE OneView for VMware vCenter Server (HPE OV4VC).
What should you check during troubleshooting process?
Your customer has me following HPE Synergy setup
- Three frames fully populated with HPE Synergy 480 Gen10 Plus modules and 25Gb/s downlink speed formulating a single logical enclosure
- Two HPE Virtual Connect SE 100Gb F32 Module for Synergy
- Four HPE Synergy 50Gb interconnect Link Module
- Six HPE Synergy Virtual Connect SE 32Gb FC Modules
The customer needs to add a frame.
Which statement about the expansion of this setup is true?
Refer to the exhibit.
Which statement about this logical interconnect group is true?
Your customer plans to deploy VMware ESXi 7. 0 U2, and they are looking for a hardware platform that will allow them to use up to 16 CPU sockets
Which HPE compute system meets the customer requirements?
You discovered that somebody deleted the SSO certificate that affects accessing iLO from HPE OneView from an iLO processor in an HPE Synergy compute node.
How will you recover from this problem?
Click the option that will allow you to create an OS Deployment Plan with customized kickstart.
Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter.
The customer wants to use them to manage HPE Synergy Gen10 compute modules, HPE ProLiant Gen10 servers, and an MSA array.
Which statement about compatibility of the existing environment with the planned software components is true?
Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.
When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.
What must be done to fix this issue?