New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

CQE Certified Quality EngineerExam Questions and Answers

Questions 4

M in tills drawing, the symbol is being used to indicate the

H Calculator

Options:

A.

minimum material condition

B.

minimum measured condition

C.

maximum material condition

D.

maximum measured condition

Buy Now
Questions 5

Which of the following tools specifies the use of a feedback cycle?

Options:

A.

Flowchart

B.

Cycle-time reduction

C.

Gantt chart

D.

Plan-do-check-act

Buy Now
Questions 6

When requesting "worst case" design analysis, you expect the reliability group to

Options:

A.

Analyze the worst rejects.

B.

Analyze only those products failing to meet specification requirements.

C.

Determine whether product requirements can be met with subassemblies assumed at their worst combination of tolerances.

D.

Assume all subassembly tolerances at their maximum limit.

Buy Now
Questions 7

Quality planning is an activity that identifies the needs of which of the following stakeholders?

Options:

A.

Management

B.

Suppliers

C.

Employees

D.

Customers

Buy Now
Questions 8

In a sample of 2.000 items taken from a large lot. 80 are found to be nonconforming. What is the 95% confidence interval for the proportion of nonconforming items?

Options:

A.

[0.0328. 0.0472]

B.

[0.0314. 0.0486]

C.

[0.0308. 0.0499]

D.

[0.0302. 0.049

Buy Now
Questions 9

Which of the following statements is true about the average outgoing quality limit (AOQL)?

Options:

A.

It is the replacement measure for the acceptance quality limit (AQL).

B.

It assumes screening and replacement of nonconforming units.

C.

It cannot be used to define the Dodge-Romig defect acceptance number.

D.

It can be used instead of ANSI ASQ Z1.4 single sampling plans.

Buy Now
Questions 10

An engineer has been asked to identify and apply an absolutely objective metric to evaluate risk. The best response is

Options:

A.

an absolutely objective way to measure risk does not exist

B.

lean metrics, because to minimize waste is to minimize risk

C.

six sigma metrics, because a thoroughly controlled process minimizes risk

D.

quality function deployment, to minimize risk as perceived by the customer

Buy Now
Questions 11

Short-run SPC should be used in which of the following situations?

Options:

A.

The coded data being used do not show significant shifts in the process.

B.

Regular SPC charts show the process to be out of control.

C.

Many different parts are made in small lots.

D.

The number of charts currently used needs to be increased to control the process better.

Buy Now
Questions 12

Statistical process control was originated by

Options:

A.

Deming

B.

Feigenbaum

C.

Jurau

D.

Shewhart

Buy Now
Questions 13

Which of the following techniques is used when implementing single minute exchange of die?

Options:

A.

Using more fasteners and clamps

B.

Eliminating the use of intermediate jigs

C.

Separating internal and external setup operations

D.

Adjusting and eliminating mechanization

Buy Now
Questions 14

The sample size for ANSI ASQ Z1.4. Level II plan is based on the

Options:

A.

size of the lot to be inspected

B.

size of the batch to be manufactured

C.

average size of production lots

D.

decision of the quality assurance manager

Buy Now
Questions 15

A way to convince management that a quality improvement program is needed is to present

Options:

A.

the number of audit findings the company received from the last audit

B.

the company's performance in terms of quality in comparison with its competitors

C.

die size of the problem in terms of the potential savings and increased profit that can result from fixing it

D.

data on how employees will produce better quality product and services if their pay is increased and their benefits improved

Buy Now
Questions 16

The limits of a pre-control chart are based on

Options:

A.

specifications

B.

natural tolerance

C.

process standard deviation

D.

process capability

Buy Now
Questions 17

Accelerated aging of a sterile barrier system is an example of which or the following design verification methods?

Options:

A.

Analyzing

B.

Testing

C.

Demonstrating

D.

Inspecting

Buy Now
Questions 18

The following data sets were presented to top management.

Which problem area should be targeted for improvement first?

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Questions 19

Which of the following tools can be used to determine the best option from many choices based on their importance and merits?

Options:

A.

Interrelationship digraph

B.

PERT chart

C.

Tree diagram

D.

Prioritization matrix

Buy Now
Questions 20

Which of the following tools is used to plan for and avoid situations that might interfere with project implementation?

Options:

A.

Affinity diagram

B.

Matrix diagram

C.

Interrelationship digraph

D.

Process decision program chan

Buy Now
Questions 21

The effectiveness of corrective action can best be assessed by

Options:

A.

assuring that the appropriate processing documentation is changed to reflect the action taken

B.

changing the data collection system to capture the results of the corrective action

C.

redefining the applicable inspection, test, or process control requirements

D.

measuring the results of the corrective action

Buy Now
Questions 22

Which of the following problem-solving tools is a column graph which displays a static picture of the process?

Options:

A.

Pareto chart.

B.

Control chart.

C.

Histogram.

D.

Cause and effect diagram.

Buy Now
Questions 23

Which of the following is the correct test statistic to use for a paired-sample t test?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 24

The following diagram was developed from a designed experiment.

Which of the following statements is true about the factors in this experiment?

Options:

A.

They are confounded.

B.

They are replicated.

C.

They show randomization.

D.

They show interaction.

Buy Now
Questions 25

Competition, safety, warranty, service costs, and public liability are all characteristics of

Options:

A.

perceived risk

B.

supplier-customer agreement

C.

cost management

D.

system reliability'

Buy Now
Questions 26

According to ANSI ASQ Z1.4. switching from tightened inspection to normal inspection can occur when how many consecutive lots have been accepted?

Options:

A.

Four out of five

B.

Five out of five

C.

Eight out of ten

D.

Nine out of ten

Buy Now
Questions 27

The primary characteristic of risk management is being

Options:

A.

simple

B.

reactive

C.

unnatural

D.

all-inclusive

Buy Now
Questions 28

The purpose of the opening meeting for an audit is to

Options:

A.

establish the authority of the lead auditor and audit team over the auditees

B.

determine approximately how much time and what resources will be required to conduct the audit

C.

conduct introductions, review the audit's scope and procedures, and clarify details of the audit plan

D.

present the audit team's initial observations regarding the effectiveness of the auditee's quality system

Buy Now
Questions 29

A company uses four components (W. X. Y. and Z) to create its final product. The source and time factors for these components are listed below. What is die critical path for this company's final product?

ComponentSourceAcquisition TimeInstallation TimePredecessor Steps

WInternaln/a4 weeksNone

XExternal5 weeks4 weeksNone

YInternaln/a4 weeksW.X.Z

ZInternaln/a6 weeksNone

Options:

A.

6 weeks

B.

8 weeks

C.

9 weeks

D.

13 weeks

Buy Now
Questions 30

Typically Pareto diagrams are used for which of the following reasons?

Ⅰ. To display the significant few categories.

Ⅱ. To compliment attribute data charting.

Ⅲ. To eliminate insignificant categories.

Ⅳ. To focus attention in priority order.

Options:

A.

I and III only

B.

I, II and III only

C.

II, III and IV only

D.

I, II, III and IV

Buy Now
Questions 31

In a failure mode and effects analysis (FXIEA). the focus should be on

Options:

A.

classifying as failures those items with risk priority numbers greater than 100

B.

creating flowchans for the items with high risk priority number or occurrence values

C.

implementing corrective action on items that have high alpha risk values

D.

implementing corrective action on items that have high risk priority number or severity values

Buy Now
Questions 32

A process that is in statistical control has the following characteristics.

X 122

J? = 2! n = 5

What are the upper and lower control limits for the A'chart of this process?

Options:

A.

UCL = 12.72. LCL = 11.68

B.

UCL 13.25.LCL 11.15

C.

UCL = 13.41. LCL = 10.99

D.

UCL - 14.30.LCL 10.10

Buy Now
Questions 33

Which of the following quantitative methods does NOT apply to the assessment of actual system/component reliability?

Options:

A.

Statistical analysis of field test and failure data.

B.

Statistical allocation of reliability goals.

C.

Evaluation of laboratory test data.

D.

Analysis of results of reliability demonstration tests.

Buy Now
Questions 34

Which of the following types of "voice" is most effective in written communication?

Options:

A.

Active

B.

Passive

C.

Strong

D.

Soft

Buy Now
Questions 35

The following components (1,2,3) each have reliabilities of 0.95.

What is the system reliability?

Options:

A.

0.857

B.

0.903

C.

0.925

D.

0.948

Buy Now
Questions 36

A production line has job aids that outline, step by step, how to perform the tasks of the job. This is followed by each of the operators working on the line. This is an example of

Options:

A.

take time

B.

5S

C.

standardized work

D.

value stream mapping

Buy Now
Questions 37

Which of the following is most important to shaping the culture of an organization?

Options:

A.

Geographic location

B.

Management philosophy

C.

Market share

D.

Implement ISO

Buy Now
Questions 38

Under a defect classification system, a nonconformance that could cause a product's usability to be substantially reduced would be classified as

Options:

A.

acceptable

B.

minor

C.

major

D.

critical

Buy Now
Questions 39

During a daily production meeting, the materials manager discusses a priority shipment that is being delayed due to material being placed on hold from a nonconformance. The process engineer was present when the material was placed on hold and states that the nonconformance will not impact fit. form or function. The manufacturing manager shares that per the ISO standard, the risk should be accepted and the product should be shipped. Which action would be most appropriate for the quality engineer to take first?

Options:

A.

Commit to initiating a deviation and allow the material to ship but complete a corrective action

B.

Commit to completing a corrective action but insist that the material be scrapped since it is nonconforming

C.

Commit to expediting the review and disposition of the nonconforming material with the MRB

D.

Commit to getting approval from the quality manager to allow the material to ship

Buy Now
Questions 40

Which of the following definitions describes severity?

Options:

A.

Probability that the failure would be avoided or detected

B.

Probability that the failure will occur

C.

Effect on uncertainty on objectives

D.

Impact that the failure would have

Buy Now
Questions 41

A process capability analysis can best be used to

Options:

A.

define the acceptance quality limit for incoming material

B.

compare alternative processes or equipment

C.

prevent supplier deficiencies

D.

identify which attributes data to measure

Buy Now
Questions 42

The following summary of data represents the amount of time customers spend in a store between the hours of noon and 1:00 p.m. during a one-month period.

Time (minutes)Number of customers

1030

925

815

76

64

535

432

315

242

1 or less50

The summary is an example of which of the following?

Options:

A.

Stem-and-leaf plot

B.

Box plot

C.

Pareto chart

D.

Frequency distribution

Buy Now
Questions 43

80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements or specifications to all inspectors. They also instructed all employees involved in the creation of those discrepancies be re-trained.

Which of the following processes may be considered a risk treatment?

Options:

A.

Generating a weekly report of non-conformities that exceed SRM requirement and specifications

B.

Distributing weekly alert report of non-conformities to all inspectors

C.

Instructing that all employees involved creating those discrepancies be re-trained

D.

Reducing throughput at Marathon Manufacturing Co.

Buy Now
Questions 44

Adjusting machine settings to reduce the effect of ambient temperature changes on the seal strength of a paper package is an example of

Options:

A.

robust design

B.

analysis of variance

C.

statistical process control

D.

process capability

Buy Now
Questions 45

A company incurred the following quality costs last month.

Incoming material inspection$5,000

Process scrap$3,000

In-process reworkS450

Control engineering$450

Warranty$2,000

Customer complaints$6,000

Product liability$1,000

What is the total cost of external failures?

Options:

A.

$6000

B.

$8000

C.

$9000

D.

$9450

Buy Now
Questions 46

Which of the following statements BEST describes a bimodal distribution?

Options:

A.

This distribution shows stratified data and two distinct peaks.

B.

This distribution shows a single mode and bell shaped distribution.

C.

This distribution is truncated.

D.

This distribution has several distribution peaks.

Buy Now
Questions 47

A cause and effect diagram is also called which of the following?

Options:

A.

Pareto diagram.

B.

Fishbone diagram.

C.

Boxplot.

D.

Histogram.

Buy Now
Questions 48

A three-level, two-variable, full factorial experiment is to be run. The minimum number of runs will be

Options:

A.

6

B.

8

C.

9

D.

18

Buy Now
Questions 49

Which of the following activities assesses the maturity of product or system design?

Options:

A.

Critical design review

B.

Preliminary design

C.

System requirement

D.

Production readiness system

Buy Now
Questions 50

Registration to the ISO 9001 standard requires which of the following types of audit?

Options:

A.

Process

B.

Product

C.

Second-party

D.

Third-party’

Buy Now
Questions 51

Failure to cite the significant contributions of other individuals in a final manuscript for publication violates which category of the ASQ Code of Ethics?

Options:

A.

Fundamental Principles

B.

Relations with the Public

C.

Relations with Employers and Clients

D.

Relations with Peers

Buy Now
Questions 52

After attempting to prevent or control risk, which of the following types of risk will remain?

Options:

A.

Inherent

B.

Residual

C.

Control

D.

Credit

Buy Now
Exam Code: CQE
Exam Name: Certified Quality EngineerExam
Last Update: Dec 22, 2024
Questions: 175

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99