Questions 4

A project aiming at improving an organization's Net Promoter Score is nearing completion. The business analyst (BA) and stakeholders are evaluating ways to measure the performance of the solution. Which technique may be employed?

Options:

A.

Vendor assessment

B.

Market analysis

C.

Focus groups

D.

Business case

Buy Now
Questions 5

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicate whether or not the solution is contributing to the desired value. What is the recommended next step?

Options:

A.

Replace the solution as soon as possible

B.

Identify and collect more measurements

C.

Increase the efficiency of the solution

D.

Reduce the business' expectations of value

Buy Now
Questions 6

A business analyst (BA) begins to suspect that the ongoing elicitation activities with stakeholders are not delivering the quality of business analysis information required due to a lack of stakeholder participation. What type of technique can the BA adopt to resolve this type of issue?

Options:

A.

Stakeholder Engagement

B.

Roles and Permissions Matrix

C.

Requirements Validation

D.

Risk Analysis and Management

Buy Now
Questions 7

A business analyst (BA) identified that a stakeholder requirement for an online system led to a functional requirement to provide a user login screen. This is an example of which type of traceability relationship?

Options:

A.

Validate

B.

Satisfy

C.

Depend

D.

Derive

Buy Now
Questions 8

A large online retailer is introducing new technology to upgrade its aging ordering process. The business analyst (BA) has drawn a stakeholder matrix showing information on how to engage with the stakeholders throughout the project.

Using the stakeholder matrix as a guide, how should the BA engage the suppliers?

Options:

A.

Meet with the suppliers to discuss their needs

B.

Ensure the suppliers are kept informed by showing interest in their needs

C.

Communicate changes to the suppliers by general communication

D.

Focus efforts to engage with the suppliers regularly

Buy Now
Questions 9

You are the business analyst for your organization. Your current project is using a plan-driven approach for the requirements, business analysis, and monitoring. Which one of the following statements best describes the plan-driven approach to business analysis planning and monitoring?

Options:

A.

Plan-driven approaches encourage changes that prevent errors and omissions.

B.

Plan-driven approaches typically call for a significant amount of formality and detail.

C.

Plan-driven approaches determine how priorities will be diagnosed for the project solution.

D.

Plan-driven approaches typically have meetings daily to discuss the business analysis requirements process.

Buy Now
Questions 10

Which approach is used to focus on minimizing up-front uncertainty?

Options:

A.

Class-driven approach

B.

Change driven approach

C.

Solution-driven approach

D.

Plan-driven approach

Buy Now
Questions 11

There are three inputs needed to determine the solution approach process. What are these inputs?

Options:

A.

Business need, organizational process assets, and enterprise environmental factors

B.

Business need, enterprise environmental factors, and required capability

C.

Business need, organizational process assets, and assumptions

D.

Business need, organizational process assets, and required capability

Buy Now
Questions 12

A business analyst (BA) has been hired to validate a project's requirements. A series of meetings with stakeholders have been scheduled to walk through each requirement as it relates to the desired future state of the organization. The desired outcome of this exercise is to ensure that all requirements:

Options:

A.

link to user stories.

B.

are articulated correctly.

C.

are funded by the business sponsors.

D.

support the delivery of needed value.

Buy Now
Questions 13

A business analyst (BA) is assessing the completeness and coherence of the requirements. The BA has considered a variety of viewpoints and has a collection of views. What has the BA constructed?

Options:

A.

Requirements architecture

B.

Requirements traceability matrix

C.

Business knowledge model

D.

Solution design

Buy Now
Questions 14

The business analyst (BA) has completed the verification of a set of requirements, but a change in scope has materialized. Which technique should the BA use to obtain consensus and reach agreement among the stakeholders?

Options:

A.

Financial analysis

B.

Business rules analysis

C.

Decision analysis

D.

Risk analysis and management

Buy Now
Questions 15

A business analyst (BA) has been spending the majority of the past week cataloguing the new, removed, and modified components of an upcoming project. What is the main purpose of the BA performing this work?

Options:

A.

To establish the key performance indicators

B.

To define the future state

C.

To identify the domain subject matter expert

D.

To document the current state

Buy Now
Questions 16

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, informed (RACI) matrix, who must approve the change before it is implemented?

Options:

A.

Subject matter expert

B.

Business sponsor

C.

Project manager

D.

System architect

Buy Now
Questions 17

A business analyst (BA) is currently verifying the accuracy and consistency of information obtained from the stakeholders. The BA needs to identify additional information. What should the BA do next?

Options:

A.

Perform data modelling

B.

Conduct elicitation activities

C.

Meet with the sponsor

D.

Consult with the project manager

Buy Now
Questions 18

A business analyst (BA) is compiling information about different approaches that will meet solution

requirements in order to make a recommendation for solution design. To evaluate whether externally available solutions meet the requirements, which of the following will the BA create and distribute?

Options:

A.

Statement of Work (SOW)

B.

Rough Order of Magnitude (ROM)

C.

Request for Information (RFI)

D.

Work Breakdown Structure (WBS)

Buy Now
Questions 19

Before beginning requirements elicitation, a business analyst (BA) has planned the necessary activities, identified needed stakeholders, and documented this in the Business Analysis Plan. Which approach will help the BA ensure that stakeholders are available when required?

Options:

A.

Talk to the stakeholders' managers to ensure the resources will be available

B.

Send meeting invitations well in advance so stakeholders can plan in time

C.

Conduct a review of the plan with the stakeholders and adjust according to the feedback received

D.

Request an introduction letter from the business sponsor highlighting the importance of the initiative

Buy Now
Questions 20

A client wants to rehire a business analysis consulting firm for another project. The assigned business analyst (BA) developed a good rapport with the stakeholders, but delivered documents that contained lots of technical jargon that the client could not fully understand. Based on the feedback, the consulting company should:

Options:

A.

recommend a new methodology which is the latest trend in the industry.

B.

assign a different BA to the project.

C.

discuss the feedback during the brainstorming sessions after project completion.

D.

identify performance metrics before commencing work.

Buy Now
Questions 21

A survey on a new system was conducted after the chief executive officer (CEO), who is also the project sponsor, expressed concerns about the uptake of the new system. The CEO is neither sure that the concerns are valid nor whether the survey was conclusive about the success of the project. The business analyst (BA) has been tasked to address the concerns expressed by the CEO and evaluate the results of the survey. What must the BA do to determine that the system is performing as intended and address the concerns of the CEO?

Options:

A.

Evaluate the new system against competitor applications

B.

Confirm the satisfaction of business requirements

C.

Conduct another survey to validate the original results

D.

Validate performance measures and alignment with KPIs

Buy Now
Questions 22

A senior business analyst (BA) is tasked with verifying a set of requirements written by a junior BA for a

system. During this exercise, the junior BA will ensure that the requirements exhibit atomic characteristics. The senior BA will be verifying that the requirements:

Options:

A.

can be understood independently of other requirements.

B.

are written using terminology common for the audience.

C.

contain no extraneous and unnecessary content.

D.

are aligned with the identified need of the stakeholders.

Buy Now
Questions 23

You are the business analyst for your organization and management has asked you to select a model for your solution. Management wants you to describe the people within and without of your organization who will interact with the solution. What type of model has management asked you to create?

Options:

A.

Events

B.

Concept and relationship

C.

Process

D.

User classes, profiles, and roles

Buy Now
Questions 24

As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following is an elicitation process that is a part of job observation?

Options:

A.

Identifying stakeholders

B.

Job shadowing

C.

Defining and determining business analysis processes

D.

Planning how requirements will be approached, traced, and prioritized

Buy Now
Questions 25

Which of the following defines all of the required work to satisfy the requirements of the project?

Options:

A.

Project scope

B.

Requirements envisioning

C.

Requirements foundation

D.

Product scope

Buy Now
Questions 26

You are a Business Analyst for your organization, and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Why is it important to complete the plan business analysis approach?

Options:

A.

This task describes the amount of time needed for the business analysis approach.

B.

This task describes the amount of budget needed for the requirements elicitation.

C.

This task describes how to select an approach for performing business analysis.

D.

This task describes the processes the business analyst will or will not do based on the time and budget available.

Buy Now
Questions 27

A project is initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?

Options:

A.

Conduct an impact analysis

B.

Estimate the scope of work

C.

Resolve differences of opinion

D.

Perform a feasibility study

Buy Now
Questions 28

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

Options:

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Buy Now
Questions 29

The following chart represents attendance of subject matter experts (SME) and the solution owner for a requirements review and approval meeting held weekly by a business analyst (BA).

The requirements package was approved by the solution owner during the May 30 meeting. After implementation of the solution, the BA learns that the users in SME-3 s area are not using the system. Which business analysis activity should the BA have monitored more closely to mitigate this situation?

Options:

A.

Business processes

B.

Requirements scope

C.

Solution performance

D.

Stakeholder engagement

Buy Now
Questions 30

A business analyst (BA) has completed multiple workshops involving a number of stakeholders including the project manager however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

Options:

A.

The project manager should decide which requirement is relevant.

B.

The BA should select which requirements are correct.

C.

The project manager should model requirements in a review meeting.

D.

The BA should model the elicited requirements in a review meeting.

Buy Now
Questions 31

An organization has hired a consulting firm to implement and customize a software solution they purchased. The firm has raised concerns regarding the effort required to develop a solution that meets all requirements. On what basis should the requirements be prioritized in this context?

Options:

A.

Benefit

B.

Cost

C.

Risk

D.

Penalty

Buy Now
Questions 32

A general insurance company wants to enter a new segment that has the potential for high profit and little competition. The business analyst (BA) was asked to prepare a presentation for key stakeholders to show how the new segment will deliver value for stakeholders. Which of the following is best suited for this purpose?

Options:

A.

Capability analysis man

B.

Business architecture

C.

Business model canvas

D.

Business case

Buy Now
Questions 33

The product backlog refinement meeting for a project is complete but two stakeholders do not agree on the priority of several product backlog items. What should the business analyst (BA) do to help move the project forward?

Options:

A.

Schedule a backlog walkthrough with the two stakeholders

B.

Confirm the authority of the two stakeholders

C.

Notify the project manager

D.

Apply the previous backlog priority

Buy Now
Questions 34

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

Options:

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Buy Now
Questions 35

A business analyst (BA) has discovered an old checklist prepared for another initiative, which includes the following characteristics: Complete, Feasible, Unambiguous, Testable. What is the purpose of this checklist?

Options:

A.

To verify requirements

B.

To measure solution performance

C.

To validate requirements

D.

To compare solution options

Buy Now
Questions 36

Which of the following documents graphically depicts the project team members and displays their interrelationship for a specific project?

Options:

A.

Project team directory

B.

Project organization chart

C.

Project scope statement

D.

Project charter

Buy Now
Questions 37

You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?

Options:

A.

RAM Chart

B.

Affinity Diagram

C.

Stakeholder Analysis

D.

Text-Oriented Chart

Buy Now
Questions 38

What does the decomposition of activities and tasks based on the work breakdown structure create for the business analyst?

Options:

A.

Activity list

B.

Business analysis plan

C.

Network diagram

D.

Project management plan

Buy Now
Questions 39

Complete this statement. are longer-term, ongoing, and qualitative statements of a state or condition that the organization is seeking to establish and maintain.

Options:

A.

Objectives

B.

Goals

C.

Requirements

D.

Operations

Buy Now
Questions 40

You are the business analyst for your organization and your manager has asked you to prepare an analysis of each proposed solution. Your manager wants you to determine whether and how each option can provide an expected business benefit to meet the stated business need. What is your manager asking you to create?

Options:

A.

Feasibility study

B.

Abbreviated study

C.

Alternative identification analysis

D.

Quantified analysis

Buy Now
Questions 41

A project to implement shared registration procedures across multiple jurisdictions has stalled several times. The new business analyst (BA) assigned to the project used a collaborative game to elicit requirements. What effect was the BA attempting to achieve?

Options:

A.

Minimal variance from planned effort

B.

Close alignment with corporate values

C.

Stimulate teamwork in a fun situation

D.

High confidence in conclusions

Buy Now
Questions 42

Holly's organization uses a plan-driven approach to business analysis. When it comes to communication in Holly's organization what type of communication will likely be required?

Options:

A.

Face-to-face

B.

Ad hoc

C.

Chain of command

D.

Formal

Buy Now
Questions 43

Which one of the following terms is not a business analysis planning and monitoring approach?

Options:

A.

Structured walkthroughs

B.

Decision analysis

C.

Requirements elicitation

D.

Process modeling

Buy Now
Questions 44

There are four methods to generate the business need in an organization. Which approach is described as the need to achieve a strategic goal?

Options:

A.

From the bottom up

B.

From external drivers

C.

From the top down

D.

From middle management

Buy Now
Questions 45

Bonny is the business analyst for her organization and she's making a determination from which vendor the solution should be purchased. She has identified several categories to measure each vendor's overall performance and solution. cost, schedule, experience, certification, references, and years in business. For each category, she has identified scores the vendor may earn; for example, cost is worth 25 points, schedule is worth up to 20 points, and years in business is worth up to ten points. The vendor who gets the most points in the assessment will win the contract. What is Bonny using in this scenario?

Options:

A.

Scoring model

B.

Vendor profile assessment scale

C.

Weighted scoring model

D.

Screening system

Buy Now
Questions 46

Which one of the following statements best describes the purpose of allocating requirements?

Options:

A.

Optimize efficiency and link to productivity.

B.

Limit the risk exposure.

C.

Maximize the business value.

D.

Increase productivity through efficiency.

Buy Now
Questions 47

Which approach is best to take when a business analyst is assessing the solution options for a business need when there are relatively few criteria involved?

Options:

A.

Focus on the life cycle costs of the solutions.

B.

Focus on the commonalities of the solutions.

C.

Focus on the differences of the solutions.

D.

Focus on the implementation cost of the solutions.

Buy Now
Questions 48

You work as a project manager for SoftTech Inc. You are working with the project stakeholders to begin the qualitative risk analysis process. You will need all of the following as inputs to the qualitative risk analysis process except for which one?

Options:

A.

Risk management plan

B.

Stakeholder register

C.

Project scope statement

D.

Risk register

Buy Now
Questions 49

As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following are business analysis planning and monitoring activities? Each correct answer represents a complete solution.

Options:

A.

Job shadowing

B.

Planning how requirements will be approached, traced, and prioritized

C.

Identifying stakeholders

D.

Defining and determining business analysis processes

Buy Now
Questions 50

The creative thinking process has three values to determine the effectiveness of the process. Which one of the following is not a measurement of effective creative thinking?

Options:

A.

Willingness of stakeholders to accept new approaches

B.

Generation of a pre-determined number of new ideas for a business solution

C.

Application of new ideas to resolve existing problems

D.

The successful generation and productive consideration of new ideas

Buy Now
Questions 51

A business analyst in her organization has identified all of the terminology of the solution, the acronyms the organization will use, and the nomenclature of her department where the endeavor will take place. Where should all of this information actually be stored?

Options:

A.

WBS

B.

Business analysis register

C.

Terminology register

D.

Data dictionary

Buy Now
Questions 52

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex. What thing adds to the level of complexity among requirements?

Options:

A.

Relationships among the requirements

B.

Management in the project

C.

Cost and schedule constraints

D.

Stakeholders in the project

Buy Now
Questions 53

A business analyst (BA) has determined that “Product Box”, a collaboration game, will provide a fun way to engage the stakeholders when working on prioritizing the list of features. What should the BA do?

Options:

A.

Ensure buy-in from key stakeholders

B.

Send out an agenda in advance

C.

Research ideas for the new product

D.

Consider meeting logistics

Buy Now
Questions 54

You are a business analyst for your organization. Your current business analysis endeavor includes working with stakeholders located in offices around the world. Because these stakeholders are dispersed, what is likely to increase in this endeavor as opposed to a collocated group of stakeholders?

Options:

A.

Costs

B.

Face-to-face meetings

C.

Communication needs

D.

Risks

Buy Now
Questions 55

The task of prioritizing requirements creates just one output. What is it?

Options:

A.

Validated requirements

B.

Requirements (prioritized)

C.

Requirements rankings

D.

Requirements assessment

Buy Now
Questions 56

You are the business analyst in your organization and you're working to organize the requirements for the business units in your company. Which technique is best suited for structuring requirements around the needs of each stakeholder group?

Options:

A.

Organizational modeling

B.

User stories

C.

Data modeling

D.

Functional decomposition

Buy Now
Questions 57

Beth is a business analyst for her organization and she's completing the tasks in the requirements management and communication knowledge area. As a result of these tasks, she'll create several things for her organization. Which one of the following, however, is not one of the outputs of the requirements management and communication tasks?

Options:

A.

Traced requirements

B.

Requirement management plan

C.

Requirement package

D.

Approved requirements

Buy Now
Questions 58

Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?

Options:

A.

Brainstorm the business need.

B.

Create a data diagram for the service.

C.

Define the business need.

D.

Elicit the requirements of the proposal.

Buy Now
Questions 59

An organization has two different solutions to grow its business. One project is worth $375,000 to the organization. The second project is worth $565,000 to the business. The organization can only do one of the projects and elects to do the second project for $565,000. What is the opportunity cost of this decision?

Options:

A.

$190,000

B.

$565,000

C.

$375,000

D.

$940,000

Buy Now
Questions 60

A business analyst must consider the business value a solution brings in relation to the cost of implementing the desired solution. Suppliers will often be limited in the amount of requirements they can implement based on the allocated resources. If there are not enough resources to implement all of the solutions, what can the business analyst create to justify the additional funds for the implementation?

Options:

A.

Business case

B.

Cost analysis

C.

Risk assessment with positive risk analysis

D.

Benefits-cost ratio

Buy Now
Questions 61

Complete this statement. Policies and rules serve as boundaries and the organization and the operation of the organization.

Options:

A.

Influence

B.

Constraint

C.

Direct

D.

Lead

Buy Now
Questions 62

In order to plan the business analysis approach, the business analyst must understand the organizational process needs and what other thing?

Options:

A.

Operation of organizations and the objectives of business analysis

B.

Consideration of risk and reward

C.

Purpose of the proposed solution

D.

Stakeholders' threats and perceived threats

Buy Now
Questions 63

A business owner has identified a high priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to perform an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Number of systems being affected by the requirement

B.

Original source of the requirement

C.

Method of requirement communication

D.

Selection of the elicitation for the requirement

Buy Now
Questions 64

Two stakeholders are arguing over which model to use for describing requirements. One insists that using an activity diagram is superior while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?

Options:

A.

Explain that the models are complementation to each other

B.

Allow both stakeholders to work on the models independently

C.

Introduce a third model type so that neither stakeholder prevails

D.

Suggest a fusion model that integrates activity and state diagrams

Buy Now
Questions 65

A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?

Options:

A.

Consider business relevance while tracing requirements

B.

Choose appropriate format to communicate requirements

C.

Ensure test scenarios align to business requirements

D.

Facilitate a focus group with users to get feedback

Buy Now
Questions 66

A new Chief Executive Officer (CEO) is appointed to revive a chain of well-recognized superstores. The CEO wants to increase sales by introducing on-line shopping. Most stores are understaffed and maintenance is a challenge. Which of the following would be

considered an asset?

Options:

A.

Store maintenance expenses

B.

Brand reputation

C.

Interest mounting on bank loan

D.

Online shopping website

Buy Now
Questions 67

A business analyst (BA) is in the process of specifying the confirmed results of a requirements elicitation workshop. Which of the following help to ensure that the correct information about the requirements is provided to the participants?

Options:

A.

Requirements architecture

B.

Stakeholder list

C.

Standard templates and syntax

D.

Roles and permissions matrix

Buy Now
Questions 68

The business analyst (BA) is helping the business stakeholders prioritize requirements for a new customer portal for managing orders, delivery, and payment information. A number of requirements address compliance with regulations regarding access for people with disabilities. What factor should the BA use to guide the stakeholders when assigning a priority for these specific requirements?

Options:

A.

Dependencies

B.

Penalties

C.

Risk

D.

Stability

Buy Now
Questions 69

A new contract requires a thorough level of documentation to be developed and maintained with planned phases of reviews and authorized sign offs. Which approach fits this contract?

Options:

A.

Waterfall

B.

Agile

C.

Scrum

D.

Iterative

Buy Now
Questions 70

A business analyst (BA) is designing solutions for a set of requirements and finds that there is an opportunity to improve the operations of the business. Which of the following is an opportunity for improvement the BA could recommend?

Options:

A.

Create a solution by constructing a number of solution components to meet the requirements

B.

Enable the solutions that will satisfy the highest priority requirements and stakeholder needs

C.

Provide information to staff so they can answer customer inquiries directly themselves

D.

Purchase software that contains features that are not currently required but are included for free

Buy Now
Questions 71

A project manager asks a business analyst (BA) to conduct a meeting to walk the stakeholders through how requirements are structured. Which of the following requirement viewpoints will help the BA provide that information?

Options:

A.

State model

B.

Business capability analysis

C.

Business process model

D.

Data streams

Buy Now
Questions 72

Stakeholder requirements where approved for a business process reengineering initiative along with the Creation of a | roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

Options:

A.

Requirement performance measures

B.

Scope model

C.

Requirement description

D.

Requirement attribute values

Buy Now
Questions 73

A business analyst (BA) has elicited non-functional information for a system's replacement. In reviewing the elicitation results, the BA finds the number of concurrent users is a large portion of the target user group, which seems high. How should the BA proceed?

Options:

A.

Observe a user performing the task to determine the length of time to complete the task

B.

Document the elicitation results in the solution requirements specification then seek verification and validation in a requirements review

C.

Conduct additional stakeholder analysis to determine whether any additional user groups were overlooked

D.

Confirm elicitation results by researching the actual concurrent users on the existing system and review findings with stakeholders

Buy Now
Questions 74

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

Options:

A.

Create a process model

B.

Develop a work breakdown structure

C.

Build an entity-relationship diagram

D.

Construct a decision tree

Buy Now
Questions 75

During a lesson learned session, stakeholders had a heated discussion on the performance measures being employed and why they are necessary. The business analyst (BA) explained that performance measures are required to:

Options:

A.

evaluate whether the required return on investment is met.

B.

gather insights into the value provided by a solution.

C.

decide if similar projects should be taken up again.

D.

verify that organizational resources were spent wisely.

Buy Now
Questions 76

The project manager has tasked the business analyst (BA) to collect a performance measure on the solution implemented in the latest release. Which of the following considerations can help the BA obtain that information?

Options:

A.

Sample size

B.

Solution size

C.

Performance variance

D.

Risk assessment

Buy Now
Questions 77

While gathering information during a requirements workshop, a subject matter expert states that it is likely that an organizational restructure will occur in one of the business departments that will be utilizing parts of the new system. As such, the business analyst (BA) should:

Options:

A.

ask the project sponsor to confirm whether and when the restructure will occur.

B.

record a risk that requirements may change and further explore the likelihood and impact of the risk.

C.

note the constraint that the solution must be flexible to accommodate different roles after implementation.

D.

proceed as if the business unit will not be restructured and wait for the organization to confirm otherwise.

Buy Now
Questions 78

The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?

Options:

A.

Demonstrate the functionality of the new CRM

B.

Reuse requirements models from each company

C.

Ensure all regulatory requirements are documented

D.

Create merged viewpoints of the requirements

Buy Now
Questions 79

A business analyst (BA) is logging the end user concerns and resolves these on a priority basis as mandated by the government. This project is a simple application, with no major strategic or financial impact to the organization. The BA strongly enforced end-to-end requirement traceability for this project. Why would the BA recommend this traceability approach?

Options:

A.

Regulatory requirements

B.

Costs and benefits

C.

Organizational standards

D.

Complexity of the domain

Buy Now
Questions 80

The business analyst (BA) is preparing for requirements review with a group of stakeholders. The BA must determine how best to model the requirements for the review. Which of the following guidelines and tools will the BA use?

Options:

A.

Current state description

B.

Requirements architecture

C.

Methodologies and framework

D.

Domain knowledge

Buy Now
Questions 81

The emergence of self-driving vehicles has disrupted the auto insurance industry. The Chief Information Officer (CIO) has asked the business analyst (BA) to modify the existing business model to include self-driving vehicles. Which of the following will be valuable information for the BA to use?

Options:

A.

Vision and mission statement

B.

Project charter

C.

Business architecture framework

D.

Organizational structure

Buy Now
Questions 82

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture the information in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

Options:

A.

Predictive

B.

Reactive

C.

Proactive

D.

Adaptive

Buy Now
Questions 83

A business analyst (BA) develops a template to document the product feature requirements for an enterprise software solution. Within the template, the BA includes the following additional information: source, priority level, level of complexity, and last modified date. What does the additional information describe?

Options:

A.

Requirement analysis

B.

Requirement traceability

C.

Requirement attributes

D.

Requirement management

Buy Now
Questions 84

A business analyst (BA) is working on a project to improve product delivery. The issues arise during the latter stages of the delivery Freecycle and are due to poor communication of the business analysis information from the elicitation phase. As a result, a BA has ensured that the testing and training teams are identified as stakeholders on the RACI Matrix going forward. To which RAG designation should the training and testing teams be added?

Options:

A.

Consulted

B.

Responsible

C.

Accountable

D.

Informed

Buy Now
Questions 85

A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modelling formats will show the requirements for both systems side by side?

Options:

A.

Activity Flow

B.

Matrix

C.

Glossary

D.

Bubble Chart

Buy Now
Questions 86

A finance manager wants to begin a new project to replace the existing expenses processing system. The finance manager feels that the current expense submission-to-reimbursement process takes too long and is substantiated by 50% more complaints regarding incorrect reimbursement amounts than the same time last year. What should the business analyst (BA) investigate first?

Options:

A.

Submission processes to determine which activities can be fully automated

B.

Business process to uncover inefficiencies and falling control points

C.

Enterprise information model to ensure definitions are still valid

D.

Finance solution vendors for inclusion in a Request for information

Buy Now
Questions 87

A senior business analyst (BA) must review the requirements specification of a junior BA. The senior BA puts together a list of key evaluation criteria to guide the determination of a requirement's quality. Which of the criteria below is a characteristic of a quality requirement?

Options:

A.

Atomic

B.

Owned

C.

Mapped

D.

Allocated

Buy Now
Questions 88

A business. analyst (BA) is working on a project to implement a commercial off-the-shelf application for tracking customers. In an observation session with a Domain subject matter expert (SMF). the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

Options:

A.

Reduction of duplicate tasks performed by staff

B.

Potential to provide future value supported by the system

C.

Ability to provide greater amount of information to staff

D.

Automation to increase consistency of behavior

Buy Now
Questions 89

A business analyst (BA) spent three months eliciting, specifying, and modelling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?

Options:

A.

Manage conflicts and issues

B.

Track and communicate approval

C.

Gain consensus

D.

Understand stakeholder roles

Buy Now
Questions 90

A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company's needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?

Options:

A.

Negative Impact to value

B.

Positive Evaluation Results

C.

Risk Tolerance

D.

Issue Management

Buy Now
Questions 91

A senior manager wants to know at what stage the business analyst (BA) is with the requirements management process. The BA immediately sends a 600-page document with models and business rules to all stakeholders. Which best practice did the BA violate in this situation?

Options:

A.

The business rules were included

B.

The communication method was inappropriate

C.

The distribution included all project stakeholders

D.

The models were included

Buy Now
Questions 92

A company wants to launch a new product that will have similar features to an existing product. A business analyst (BA) working on the project has invited the product manager to explain the features and business rules of the new product. Which activity must the BA perform in preparation of the session?

Options:

A.

Align the scope of the project to the company’s strategy

B.

Review information about the existing project

C.

Ensure requirements are traceable

D.

Determine the communication plan for requirements

Buy Now
Questions 93

In a project meeting, stakeholders presented conflicting views on how the business analysis process should be conducted, leading to the sponsor becoming very upset. If a similar situation arises in the future, what can the business analyst (BA) do to avoid the situation?

Options:

A.

Communicate with each stakeholder individually

B.

Obtain stakeholder signoff on the approach

C.

Develop a cleaner RACI matrix

D.

Obtain approval for the business case

Buy Now
Questions 94

A business analyst (BA) elicits requirements from end users for a new application, and then completes a set of use cases and use case scenarios. What should the BA do next?

Options:

A.

Identify all the roles and responsibilities

B.

Review the use case scenarios

C.

Conduct a requirements workshop

D.

Create acceptance and evaluation

Buy Now
Questions 95

A business analyst (BA) is working on a project that follows incremental and iterative approaches. The BA and the stakeholders have shortlisted several user stories to be considered in the project scope. Which of the following methods would enable them to arrive at a common understanding on delivering value in the product and ranking the stories?

Options:

A.

Story decomposition

B.

State modelling

C.

Value stream mapping

D.

MoSCoW prioritization

Buy Now
Questions 96

Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?

Options:

A.

Benefit

B.

Dependency

C.

Stability

D.

Risk

Buy Now
Questions 97

A business analyst (BA) must model information characteristics across multiple information systems for a project. What type of model captures this information?

Options:

A.

Interface analysis

B.

Business capability analysis

C.

Decision analysis

D.

Force field analysis

Buy Now
Questions 98

A business analyst (BA) has completed documenting requirements and to save time, recommends sharing the requirements document with the development team to fast-track development immediately. What issue may arise by doing so?

Options:

A.

Stakeholders may refuse the solution.

B.

Requirements metrics may not be measurable.

C.

The BA may significantly impact other aspects of the project timeline.

D.

The business need may change.

Buy Now
Questions 99

Stakeholders need a financial report that can be published and distributed to multiple end users. They would also like the report to be developed within a specific time frame and within cost. What must the business analyst (BA) do to achieve this goal?

Options:

A.

Review the project budget

B.

Revise business requirements

C.

Define solution approaches

D.

Update the project schedule

Buy Now
Questions 100

A project's business requirements require that the new solution reduce the labor costs currently attributed to performing end of month accounting procedures. Currently the company routinely must pay overtime to meet the deadline. The business analyst (BA) has been documenting the process and wants to ensure that the approach to the process design is feasible for the staff who perform the end of month procedures. Which of the following stakeholders will provide this verification?

Options:

A.

Implementation subject matter expert

B.

Domain subject matter expert

C.

Operational support

D.

Project sponsor

Buy Now
Questions 101

A business analyst (BA) has decided to use a passive/unnoticeable job shadowing elicitation approach. What is an advantage of using this technique?

Options:

A.

Experiencing the performance of the task in a hands-on approach

B.

Obtaining the opinions of the performers without management interfering

C.

Gaining clarity in the process by asking Questions of the performer as it is being performed

D.

Identifying instances of informally performed tasks as well as any workarounds

Buy Now
Questions 102

A business analyst (BA) is measuring solution performance of a new system. What should the BA consider to avoid skewed results and an inaccurate conclusion?

Options:

A.

Frequency

B.

Volume

C.

Currency

D.

Timing

Buy Now
Questions 103

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

Options:

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Buy Now
Questions 104

A business analyst (BA) needs to make sure that the business analysis information is securely stored and accessible to stakeholders. Which element helps in achieving that goal?

Options:

A.

Requirements attributes

B.

Organization of information

C.

Traceability approach

D.

Level of abstraction

Buy Now
Questions 105

A business analyst (BA) creates the following diagram as part of current state analysis activities.

What does a diagram of this type help users to understand?

Options:

A.

Decision-making

B.

Regulatory compliance

C.

Business capability

D.

Process improvement

Buy Now
Questions 106

A banking giant recently found a major security loophole in their online banking platform that could expose customer information. Security experts and the business analyst (BA) develop a low cost, low effort emergency fix to address this issue. What factor should the BA use to convince the bank to move forward with the emergency fix?

Options:

A.

Cost

B.

Schedule

C.

Impact

D.

Urgency

Buy Now
Questions 107

A new payments system was recently implemented to replace an old legacy system. The system users have lodged a complaint that the new system is slower than the old system but system performance statistics show more efficiency. How does the business analyst (BA) demonstrate to users how the new system is performing?

Options:

A.

Collect system metrics and communicate results in an understandable format

B.

Identify the dependencies of the system with other applications

C.

Analyze the feasibility of including additional hardware resources to the system

D.

Evaluate the payments process to identify areas of improvement in the system

Buy Now
Questions 108

A business analyst (BA) is planning the requirements attributes. The BA received a long list of requirements that must be implemented in different phases. Which requirements attribute can the BA include to allocate the requirements to the proper phase?

Options:

A.

Status

B.

Author

C.

Priority

D.

Source

Buy Now
Questions 109

Due to a change in regulation, a solution being implemented has a new compliance requirement that must be evaluated. The requirements change strategy focuses on total cost of change as the primary driver for decisions. The business analyst (BA) compiled the following impact assessment of the proposed change based on the new compliance requirement.

What recommendation should the BA make to the stakeholders based on the above information?

Options:

A.

Approve the requirement

B.

Request additional information

C.

Defer the requirement

D.

Reject the requirement

Buy Now
Questions 110

A stakeholder would like to add requirements to an IT project which is in flight. The project manager wants to revisit the traceability repository prior to committing to the addition of any new requests, because it is used for which of the following activities?

Options:

A.

Creating test plans and test cases

B.

Approving requirement relationships

C.

Developing documentation for technical support

D.

Supporting change and scope management

Buy Now
Questions 111

A business analyst (BA) is working on a set of tasks to establish a governance process for the project. The BA intends to identify who has authority and responsibility to propose changes, who should be involved in the change discussions, and how changes will be documented and communicated. Which of the following are the inputs that would help the BA complete the task?

Options:

A.

Business analysis approach and stakeholder engagement approach

B.

Governance approach and stakeholder engagement approach

C.

Governance approach and business analysis approach

D.

Stakeholder engagement approach and information management approach

Buy Now
Questions 112

A global organization is implementing a new Knowledge Management System and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?

Options:

A.

Repository

B.

Document management

C.

Email

D.

Individual collaboration

Buy Now
Questions 113

A business analyst (BA) was asked to send the requirement details to the project manager (PM), director, vice president (VP), and Chief Information Officer (CIO). The BA shares the complete set of requirements to the PM and director, while creating a summarized version for the VP and CIO. Which aspect of requirement specification and modeling was the BA performing?

Options:

A.

Perform stakeholder analysis

B.

Organize requirements categories

C.

Determine approval authority

D.

Implement appropriate level of abstraction

Buy Now
Questions 114

A business analyst (BA) is working on a project to provide a temporary solution that will last for two months. The BA is feeling overwhelmed with the work needed to create the huge number of links to provide full traceability from solution requirements to design for this solution. How can the BA justify omitting all possible links?

Options:

A.

Such traceability is at a lower level of abstraction for this project

B.

The value each link is delivering in this situation is not high

C.

Traceability is a low priority as the BA has other work to complete

D.

It is impossible for anyone to confirm if such links are correct

Buy Now
Questions 115

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

Options:

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Buy Now
Questions 116

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

Options:

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Buy Now
Questions 117

The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?

Options:

A.

The models were included as a mistake because Use Case diagrams are technical.

B.

The models are part of the technical documents and not part of BRD documents.

C.

The models are used for analysis and refining requirements and design.

D.

The models did not change the value compared to text-based requirements

Buy Now
Questions 118

What do business goals and objectives of enterprise analysis actually describe?

Options:

A.

Business goals and objectives describe the increased revenue that the organization is seeking to gain.

B.

Business goals and objectives describe the solution scope that the organization is seeking to accomplish.

C.

Business goals and objectives describe the ends that the organization is seeking to achieve.

D.

Business goals and objectives describe the desired future state of problems.

Buy Now
Questions 119

You are the business analyst for a large project for your organization. Your project has 65 stakeholders and this will greatly increase the complexity of the communication in this project. To demonstrate how complex this project and its communication will be, you show the management the number of communication channels in this project. How many channels exist in this project based on the number of stakeholders?

Options:

A.

4160

B.

4225

C.

65

D.

2080

Buy Now
Questions 120

What type of a business analysis approach focuses on the rapid delivery of business value in short iterations?

Options:

A.

Risk-driven

B.

Profit-driven

C.

Change-driven

D.

Risk-laden

Buy Now
Questions 121

When a business analyst hosts a structured walkthrough of the requirements, what should the walkthrough always include at the beginning of the process?

Options:

A.

Review of the business case for the analysis

B.

Review of the requirements to be discussed

C.

Agenda

D.

Identification of the objectives and goals

Buy Now
Questions 122

You are the business analyst for a new project. Part of this project is for the project team to manually install new workstations through the company's campus. Based on your research you have determined that the project team can install 25 new workstations per hour. Since there is a fixed amount of time that these workstations need to be installed you are considering adding additional labor for the implementation. You are also considering to adjust the prioritization of the project requirements based on the amount of workstations the project team can install per hour. What does the 25 workstations per hour represent in this scenario?

Options:

A.

Parametric estimate

B.

Planning

C.

Report project

D.

Timeboxing

Buy Now
Questions 123

Brian is the business analyst for his organization and he's hosting a brainstorming session. He is facilitating the session with eight stakeholders. Why is it important for Brian to not set a goal for the number of ideas the group should generate in the session?

Options:

A.

A goal for the number of ideas to be generated should be created.

B.

A goal for the number of ideas puts too much pressure on the group.

C.

A goal for the number of ideas may be too large to reach.

D.

A goal for the number of ideas actually limits the ideas that can be generated.

Buy Now
Questions 124

When using a change-driven approach, the business analyst may create an initial list of high-level requirements for the initiative. This high-level requirements list is also known as what term?

Options:

A.

Requirements envisioning

B.

Project scope

C.

Product scope

D.

Requirements foundation

Buy Now
Questions 125

Karen is the business analyst for her organization and she's reviewing the tasks within her endeavor. Several of the tasks have the characteristic that the activity will be completed with the project stakeholders, consultants, and business analyst, though this hasn't yet been approved. What is this condition of believing some things to be true about an activity without proving the validity of the belief called?

Options:

A.

Risk

B.

Assumption

C.

Constraint

D.

Boundary

Buy Now
Questions 126

In the life of a project, when do the number and impact of change requests often increase?

Options:

A.

During project planning

B.

Once the project scope is reviewed

C.

Towards the end of the project

D.

At the launch of the project

Buy Now
Questions 127

According to 'A Guide to the Business Analysis Body of Knowledge', when should the business analyst and an organization actually start requirements allocation?

Options:

A.

As soon as a budget has been created

B.

After approval of the requirements

C.

After the project charter

D.

As soon as the solution approach is determined

Buy Now
Questions 128

Which of the following is an output of the Identify Stakeholders process?

Options:

A.

Scope baseline

B.

Project charter

C.

Stakeholder register

D.

Project scope statement

Buy Now
Questions 129

What elicitation technique is best described as a study to compare the strengths and weaknesses of an organization against its peers and competitors?

Options:

A.

Brainstorming

B.

Market analysis

C.

Comparative analysis

D.

Benchmarking

Buy Now
Questions 130

Which technique in organizing requirements is best described as showing the concepts and relationships relevant to the solution or business domain?

Options:

A.

Data flow diagram

B.

Business rules analysis

C.

Data modeling

D.

Functional decomposition

Buy Now
Questions 131

You are the business analyst for your organization. Management has asked you to define and document the requirements of an endeavor so that the requirements may be reused again in the organization. Why would an organization want to re-use requirements?

Options:

A.

Re-using requirements is useful if the organization wants to sell the set of requirements to its customers.

B.

Re-using requirements is useful if the current solution fails.

C.

Re-using requirements is useful when the requirements are something the organization must do on an ongoing basis.

D.

Re-using requirements doesn't mean re-using the requirements over and over, but tracing the requirements to actual deliverables.

Buy Now
Questions 132

As a business analyst, you'll often have to coach stakeholders on the processes, knowledge areas, and tasks

you'll complete for an organization. One of the knowledge areas is enterprise analysis. This knowledge area completes all of the following activities except for which one?

Options:

A.

It defines the nature of a solution that meets that need.

B.

It identifies business needs, problems, or opportunities.

C.

It justifies the investment necessary to deliver that solution.

D.

It manages and expresses requirements to a broad and diverse audience.

Buy Now
Questions 133

Robert is the business analyst for his organization and he gathered and documented the requirements for a new solution. The stakeholders agree through informal communications that Robert has successfully captured the needed requirements for the solution. The stakeholders signoff on the requirements. What does the signoff represent to Robert?

Options:

A.

That the stakeholders agree that the requirements are constrained by time, cost, and quality.

B.

That the project can now be launched.

C.

That the stakeholders agree that the requirements are accurate and complete.

D.

That his work is done.

Buy Now
Questions 134

What type of analysis can a business analyst perform to understand the functions of stakeholders, the location of stakeholders, the tasks stakeholders complete, and the stakeholders' concerns about the solution?

Options:

A.

Technical assessment

B.

Stakeholder impact analysis

C.

Organizational assessment

D.

Operational analysis

Buy Now
Questions 135

There are four methods to generate a business need in an organization. Which approach would an organization use when there's recognized competition in the marketplace?

Options:

A.

From the bottom up

B.

From external drivers

C.

From middle management

D.

From the top down

Buy Now
Questions 136

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which of the following are primary inputs of planning the business analysis approach?

Each correct answer represents a complete solution.

Options:

A.

Organizational process assets

B.

Penalty of not seizing the opportunity

C.

Expert Judgement

D.

Business need

Buy Now
Questions 137

Martha is the business analyst for her organization and she's been asked to help create a SMART goal for her company. Which one of the following organizational goals could be considered SMART?

Options:

A.

No errors in production of customer products.

B.

Increase revenue by ten percent by January 15.

C.

Increase revenue by ten percent.

D.

Add 25 new customers to the sales base.

Buy Now
Questions 138

Which one of the following statements best describes what an assumption is?

Options:

A.

These are the things that may restrict the options for the endeavor.

B.

The weather will always be hot in the summer and cool in the winter.

C.

The project must be completed by December 18.

D.

These are things that are believed to be true, but they have not yet been confirmed.

Buy Now
Questions 139

Henry and Fred are working together on business analysis duties for the implementation of new software. Henry, the business analyst, tells Fred that they should take the current measurement of productivity, and then measure again after the solution has been implemented. This benchmarking approach will allow Henry and Fred to see the real effect of the solution on the business need. What term is assigned to this measurement?

Options:

A.

Post implementation factor

B.

Yield

C.

Key performance indicators

D.

S-Curve

Buy Now
Questions 140

You are the business analyst for a large project in your organization. While your company prefers face-to-face communications there are many stakeholders located in different geographical locations. How can you still effectively serve as a business analyst when the stakeholders are not collocated?

Options:

A.

You will need the stakeholders to periodically gather in one locale.

B.

You will need to travel on a regular rotation to each of the geographical locations to complete the business analyst duties.

C.

Add more business analysts in each of the geographical location.

D.

You will need to implement videoconferences.

Buy Now
Questions 141

Which one of the following business analysis techniques for analyzing business goals converts the business goals into achievable objectives and measures?

Options:

A.

Benchmarking

B.

Root cause analysis

C.

Functional decomposition

D.

Business rules analysis

Buy Now
Questions 142

Which approach to business analysis activities deals with rapid delivery of the business value?

Options:

A.

Quality-driven

B.

Change-driven

C.

Plan-driven

D.

Stakeholder-driven

Buy Now
Questions 143

In preparation for your business analysis examinations, you should be familiar with the tasks to complete requirements management and communication activities. How many tasks are there in the knowledge area of requirements management and communication?

Options:

A.

7

B.

4

C.

5

D.

6

Buy Now
Questions 144

You are the business analyst for your organization and you're notifying the key stakeholders of a need to gather requirements for an endeavor. One of the stakeholders that you'll need to attend your requirements workshop is the project manager. What role will the project manager have in this workshop?

Options:

A.

The project manager will facilitate the requirements workshop.

B.

The project manager will ensure that the needed resources are available.

C.

None, the project manager should not be involved until all of the requirements have been identified.

D.

The project manager will help elicit requirements from the stakeholders.

Buy Now
Questions 145

What can be considered the only input to the task of defining assumptions and constraints?

Options:

A.

Business case

B.

Prioritized requirements

C.

Requirements

D.

Stakeholder concern

Buy Now
Questions 146

Management in your organization wants you to create a graphical model to show the business logic of the requirements. What other term are graphical models known as?

Options:

A.

Flowcharts

B.

Mind maps

C.

Influence diagram

D.

Diagrams

Buy Now
Questions 147

Which of the following are documented approaches to the business analysis work? Each correct answer represents a complete solution.

Options:

A.

Deming's Quality Circle

B.

Lean

C.

Six Sigma

D.

Waterfall approach

Buy Now
Questions 148

The task of verifying requirements is used to ensure that the requirements are ready for formal review and validation by the customers and for what other purpose?

Options:

A.

For defining the specifications for the desired future state based on the solution

B.

For gaining approval of chartering the project

C.

For defining the information to allow additional work to be performed

D.

For gaining approval of cost and schedule

Buy Now
Questions 149

You are the business analyst in your organization. Management comes to you with a customer complaint that they'd like you to analyze. What's the common task associated with customer complaints or loss of revenue?

Options:

A.

Stakeholder assessment of implementation

B.

Issue management and identification

C.

Evaluation of a business need

D.

Capability assessment

Buy Now
Questions 150

You are the business analyst for the NHQ Project. You have identified several stakeholders that need different types of information related to the requirements. Which stakeholder would need detailed technical interface requirements?

Options:

A.

Project manager

B.

Testers

C.

Implementation subject matter experts

D.

Regulators

Buy Now
Questions 151

What should an organization do if the business analyst has determined that the existing capabilities are inadequate to seize an opportunity?

Options:

A.

Recommend that the organization launch a project to create the capabilities needed.

B.

Recommend that the organization not pursue the opportunity.

C.

Recommend that the organization hire contractors with the needed capabilities.

D.

Recommend that the organization share the opportunity with other organizations.

Buy Now
Questions 152

Shelly is the business analyst for her organization and she's working with Thomas to review the business requirements. They are discussing the identified requirements, how the requirements will transition to the operations, and the longevity of the solution. Thomas is concerned that the identified requirements may not map to the desired future state of the organization. What business analysis task is Shelly facilitating in this scenario?

Options:

A.

Acceptance evaluation criteria definition

B.

Requirements quality assurance

C.

Validate requirements

D.

Stakeholder management

Buy Now
Questions 153

An organization has selected a solution for a business need and the business analyst has elected to use the time boxing/budgeting technique for requirements prioritization. What is the time boxing/budgeting technique?

Options:

A.

It's a method to prioritize requirements based on a pre-determined budget and/or a pre-determined deadline.

B.

It's used when there are conflicting requirements that must be resolved quickly and cost efficiently.

C.

It's a method to rank requirements in different boxes based on time, cost, risk, and need.

D.

It's used to determine which requirements can be implemented fastest and for the least amount of cost.

Buy Now
Questions 154

You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables. The inspector's signoff on the initial deliverables is called what?

Options:

A.

Constraint

B.

Assumption

C.

Dependency

D.

Milestone

Buy Now
Questions 155

You are the business analyst for your organization. Management has asked you to create a plan that will define the proposed structure and schedule for communicating the business analysis activities to the appropriate stakeholders. What plan does management want you to create?

Options:

A.

Stakeholder Management Plan

B.

Business Analysis Plan

C.

Communications management plan

D.

Business Analysis Communications Plan

Buy Now
Questions 156

Which of the following is used as a means of validating a created, selected, or tailored business analysis approach?

Options:

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Buy Now
Exam Code: CCBA
Exam Name: Certification of Capability in Business Analysis (CCBA)
Last Update: Dec 22, 2024
Questions: 522

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99