Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

3V0-21.21 Advanced Design VMware vSphere 7.x Questions and Answers

Questions 4

A customer has a database cluster with 40/60 read/write ratio and a high IOPs requirement with no contention on an all-flash vSAN cluster.

Which two storage settings should be configured for best performance? (Choose two.)

Options:

A.

IOPs limits enabled

B.

RAID 1

C.

Deduplication and Compression disabled

D.

RAID 5/6

E.

Deduplication and Compression enabled

Buy Now
Questions 5

An architect is designing a series of new vSphere environments for an organization. The environments will be deployed in their US-East and US-West region data centers. Each data center may have one or more dedicated vSphere environments. Only the vSphere environments within a data center will be configured with Enhanced Linked Mode. The Chief Technology Officer (CTO) has authorized the use of VMware vRealize Automation Cloud for automation. The build team creates standardized virtual machine images for various operating systems in Open Virtualization Format (OVF) and publishes the latest version on an as-needed basis to an internal HTTPS-accessible repository.

The architect must design a content library topology that meets the following requirements:

  • A localized content library must be available in each data center.
  • Each content library must be updated when an image is updated and released by the build team.
  • The cloud automation platform must be able to consume the latest approved content library images.
  • It must leverage the existing build team processes.

What should the architect recommend to meet the requirements?

Options:

A.

Work with the build team to create a local content library for each vSphere environment.

Import the OVF images when new image are published to the repository.

B.

Create a local content library for the primary vSphere environment in each data center.

Create a subscribed content library for each additional vSphere environment in each data center.

Configure the content library to download content automatically.

C.

Work with the build team to automate a JSON-based manifest to the repository when changes occur in the repository.

Create a subscribed content library for each vSphere environment.

Configure the content library to download content when needed.

D.

Work with the build team to automate a JSON-based manifest to the repository when changes occur in the repository.

Create a subscribed content library for each vSphere environment.

Configure the content library to download content automatically.

Buy Now
Questions 6

An architect is designing a VMware solution for a customer to meet the following requirements:

  • The solution must use investments in existing storage array that supports both block and file storage.
  • The solution must support the ability to migrate workloads between hosts within a cluster.
  • The solution must support resource management priorities.
  • The solution must support the ability to connect virtual machines directly to LUNs.
  • The solution should use existing 32G fabric infrastructure.
  • There is no budget for additional physical hardware.

Which design decision should the architect make to meet these requirements?

Options:

A.

The ESXi hosts will leverage Fibre Channel (FC).

B.

The ESXi hosts will leverage iSCSI.

C.

The ESXi hosts will leverage Fibre Channel over Ethernet (FCoE).

D.

The ESXi hosts will leverage NFS.

Buy Now
Questions 7

Following a company merger, there are two data centers running vSphere environments. Both data centers are leveraging separate Layer 3 vMotion networks.

Which requirement must be met in order to enable vMotion migration between these locations?

Options:

A.

The vMotion service must be configured on the Management VMkernel adapter

B.

A dedicated TCP/IP stack for vMotion with a dedicated gateway must be configured

C.

A stretched vMotion network must be configured between data centers

D.

Virtual machines must be powered off in order to migrate them between data centers

Buy Now
Questions 8

An architect is preparing a design for a company planning digital transformation. During the requirements gathering workshop, the following requirements (REQ) and constraints (CON) are identified:

  • REQ01 The platform must host different types of workloads including applications that must be compliant with internal security standard.
  • REQ02 The infrastructure must initially run 100 virtual machines.
  • REQ03 Ten of the virtual machines must be compliant with internal security standard.
  • REQ04 The internal security standard specifies logical network separation for in-scope applications.
  • CON01 The customer has already purchased the licenses as part of another project.
  • CON02 The customer has five physical servers that must be reused.

Additionally, based on resource requirements, four physical servers will be enough to run all workloads. Which recommendation should the architect make to meet requirements while minimizing project costs?

Options:

A.

Use Network I/O Control to ensure the internal security zone has higher share value

B.

Purchase additional servers and plan separate, isolated clusters for workloads that must be compliant with internal security

C.

Use a single cluster and ensure that different security zones are separated at least with dedicated VLANs and firewall

D.

Use a single cluster and configure DRS anti-affinity rules to ensure internal security compliant virtual machines cannot migrate between ESXi hosts.

Buy Now
Questions 9

An architect is tasked with designing a new VMware software-defined data center (SDDC) using VMware vSAN. The architect uses a storage assessment tool to determine the storage requirements for the new vSAN cluster. The new SDDC is going to be deployed into the existing data center and must be connected to a shared core network switch.

The architect decides to use vSAN ReadyNodes with the following configuration:

  • Two disk groups with:

  • uk.co.certification.simulator.questionpool.PList@195eb530
  • Four 10 GbE ports

Which element represents a risk that should be included in this design?

Options:

A.

The number of 10 GbE capable ports in the vSAN ReadyNode

B.

The use of vSAN ReadyNodes

C.

The existing network is 10 GbE capable

D.

The use of NVMe drives for cache and capacity

Buy Now
Questions 10

An architect is designing an environment for a retail customer. The design will use a single small vCenter Server Appliance and a cluster of eight ESXi hosts at a remote site. There is a single 10 GbE connected network at the remote site to support all management services. It is not possible to create additional management networks at the remote site. Virtual machine backups at the site will be dependent on the vCenter Server being available.

Which design decision should the architect make to maximize availability for backups?

Options:

A.

vCenter Server High Availability will be configured.

B.

The vCenter Server Appliance will be protected with vSphere Fault Tolerance.

C.

The cluster will be configured to use vSphere DRS in fully automated mode.

D.

The cluster will be configured with vSphere HA and set to restart virtual machines based on guest operating system heartbeat monitoring.

Buy Now
Questions 11

An architect is designing a VMware solution for a customer based on the following information:

  • The solution must use investments in existing storage array that supports both block and file storage.
  • The solution must support the ability to migrate workloads between hosts within a cluster.
  • The solution must support resource management priorities.
  • The solution must support the ability to connect virtual machines directly to LUNs.
  • The solution should use existing IPv4 based network infrastructure.
  • There is no budget for additional physical hardware.

Which two design decisions could the architect make to meet these requirements? (Choose two.)

Options:

A.

The ESXi hosts will leverage Fibre Channel (FC)

B.

The ESXi hosts will leverage NFS 3

C.

The ESXi hosts will leverage Fibre Channel over Ethernet (FCoE)

D.

The ESXi hosts will leverage iSCSI

E.

The ESXi hosts will leverage NFS 4.1

Buy Now
Questions 12

During a requirements gathering workshop, the customer provides the following requirement:

  • A new vSphere platform must be designed securely and all interfaces must be protected against potential snooping.

How should this non-functional security requirement be documented?

Options:

A.

Interfaces must be audited.

B.

Encrypted channels must be used for all communications.

C.

Unauthorized access to interfaces must be reported within 15 minutes.

D.

Communications must be through Private VLANs (PVLAN).

Buy Now
Questions 13

An architect decides to separate virtual desktops and application servers into separate vSphere clusters to meet security and management requirements.

What are two implications of this design decision? (Choose two.)

Options:

A.

There will be an increase in management overhead.

B.

Identical hardware must be procured for all hosts.

C.

There will be a reduction in performance.

D.

The patching cycles will affect both clusters at the same time.

E.

There will be additional licensing and cost requirements for both clusters.

Buy Now
Questions 14

An architect is designing a new backup solution for a vSphere platform that has been recently upgraded to vSphere 7.

The architect wants the backup solution to perform the following:

  • Full virtual machine image backup and restore
  • Incremental virtual machine image backup and restore
  • File level backup and restore within both Windows and Linux virtual machines
  • LAN-free backup

Which functional requirement should the architect include in the design of the new backup solution?

Options:

A.

The backup solution must leverage the VMware Consolidated Backup (VCB) framework.

B.

The backup solution must leverage virtual machine snapshots.

C.

The backup solution must leverage VMware vSphere Storage APIs - Data Protection.

D.

The backup solution must leverage VMware vStorage APIs for Data Protection (VADP).

Buy Now
Questions 15

As part of a new hybrid cloud initiative for a large financial company, the customer technical team is presenting an overview of the current state of the infrastructure and their vision for a new solution.

The project team captures notes during the presentation and adds them to the discovery documentation. Which of the listed statements is a design constraint?

Options:

A.

The applications are created in-house with in-guest recovery protection

B.

The maximum tolerable data loss is 10 minutes

C.

The two data center locations have a network latency of 8 ms round-trip time (RTT)

D.

The existing storage is out of maintenance

Buy Now
Questions 16

An architect is designing a new VMware software-defined data center (SDDC) that will consist of 100 branch sites connected to a single VMware vCenter Server within the primary data center. To allow for the use of existing automation scripts, there is a requirement to replicate the names of the virtual distributed port groups across all sites. The procurement team purchases licensing and there is no further budget allocated.

Which design decision should the architect make to meet this requirement?

Options:

A.

A new vCenter Server will be deployed for each branch site

B.

A new host and cluster folder will be created for each branch site

C.

The automation script will be updated to reflect unique naming for each site

D.

A new virtual data center will be created for each branch site

Buy Now
Questions 17

A architect is designing a new VMware software-designed data center (SDDC) using vSphere 7 to meet the following requirements:

  • The SDDC must be deployed at two locations: primary and secondary.
  • vSphere Replication must be used to replicate virtual machines between the two locations.
  • Site Recovery Manager must be used to orchestrate disaster recovery (DR) activities.
  • One single-sign on (SSO) domain must be used to authenticate access at both locations.

Which design decision should the architect make to meet these requirements?

Options:

A.

A vCenter Server Appliance will be deployed to each site. Unique SSO domains will be created per site.

B.

A vCenter Server will be installed on Windows virtual machines deployed to both sites.

C.

A vCenter Server Appliance will be deployed to each site.

D.

A vCenter Server Appliance will be deployed to the primary site only.

Buy Now
Questions 18

A customer requests a review of its current vSphere platform design.

The following information is noted:

  • There are three different workload profiles for the virtual machines:
  • uk.co.certification.simulator.questionpool.PList@195e8a10
  • Tier-1, Tier-2 and Tier-3 virtual machines are all hosted on a single large vSphere cluster.
  • The Chief Information Security Officer (CISO) has raised concerns that hosting externally facing applications alongside management tools does not meet internal compliance standards.
  • The Operations team has raised concerns about Tier-1 virtual machines negatively impacting the performance of vCenter Server.
  • The Operations lead has stated that management changes have consistently been rejected by application teams.

As a result of the review, which recommendation should the architect make regarding the design of this platform?

Options:

A.

Separate Tier-1, Tier-2 and Tier-3 virtual machines using dedicated distributed virtual switches (DVS)

B.

Separate Tier-2 virtual machines onto a dedicated cluster

C.

Separate Tier-1, Tier-2 and Tier-3 virtual machines onto dedicated clusters

D.

Separate Tier-1, Tier-2 and Tier-3 virtual machines using resource pools and shares

Buy Now
Questions 19

An architect is tasked with designing a new VMware software-defined data center (SDDC) solution for an online retail customer who has a primary and secondary data center as well as 10 distribution hubs.

The customer has provided the following business requirements to help inform the design:

  • The solution must support the running of up to 1,000 concurrent virtual machines across the primary and secondary data center.
  • The solution must support the running of up to 20 concurrent virtual machines in each distribution hub.
  • The solution must support the separation of management and lines-of-business application virtual machines.
  • All management components (including directory services, backup, automation, operations and logging) must be deployed to the primary data center.
  • All virtual infrastructure components must have redundancy of N+1.
  • All sites are connected to each other using a wide area network that has multiple diversely routed links.
  • The solution should support a monthly uptime target of 99.9%.
  • The recovery time objective (RTO) for the solution must be four hours.
  • The recovery point objective (RPO) for the solution must be 24 hours.

Given the information from the customer, which assumption should the architect include in the design?

Options:

A.

All business application virtual machines can be deployed into a single cluster within the primary data center.

B.

Each distribution hub should be configured with a backup device.

C.

The wide area network has sufficient bandwidth to support centralized management.

D.

Each cluster will have a minimum of four hosts.

Buy Now
Questions 20

A VMware Service Provider is tasked with delivering a solution for continuous availability for a subset of Tier 1 virtual machines (VMs) and vApps running in their vSAN environment. The VMs make up a mission-critical application and there can be no data loss in the event of an outage at their primary data center. In the event of a regional outage, they have established a 10-minute recovery point objective (RPO). Failover/failback to the third site must be automated.

They have the following in place:

  • Two local data centers (primary and secondary) connected with 100 Gb dedicated fiber
  • uk.co.certification.simulator.questionpool.PList@195eb6c0

A third data center located on another power grid

  • 70ms latency between the primary and secondary data centers
  • Matching storage arrays at all locations

Which two solutions could be used to meet the requirements? (Choose two.)

Options:

A.

Site Recovery Manager

B.

Snapshots

C.

vSAN Metro Cluster

D.

vSphere Data Protection

E.

vStorage APIs for Array Integration (VAAI)

Buy Now
Questions 21

During a requirements gathering workshop, the customer provides the following requirement (REQ) and constraints (CON):

  • REQ01: The customer is looking for a way to limit database virtual machine (VM) placement to save on CPU licensing costs.
  • CON01: There is a single cluster with no budget to scale.
  • CON02: All virtual machines must run on the consolidated cluster.

Which two design decisions should the architect make to meet the customer requirement? (Choose two.)

Options:

A.

The solution must use VM-VM anti-affinity rules

B.

The solution must use vSphere DRS in manual mode

C.

The solution must use a vRealize Orchestrator workflow for VM placement

D.

The solution must use VM-Host affinity rules

E.

The solution must use vSphere VM and host DRS groups

Questions 22

An architect is planning the physical server configuration for a vSAN-based infrastructure.

Which operations mode should a RAID controller support to minimize potential server downtime during physical disk failures?

Options:

A.

RAID controller with Passthru mode

B.

RAID controller with RAID 5 mode

C.

RAID controller with RAID 10 mode

D.

RAID controller with RAID 6 mode

Buy Now
Questions 23

Which two statements are true about gathering functional business and application requirements? (Choose two.)

Options:

A.

It focuses on functional requirements with C-level stakeholders

B.

It leverages a single set of QUESTION NO:s for all stakeholders

C.

It might require multiple rounds of stakeholder interviews

D.

It builds stakeholder consensus

E.

It is a non-iterative process

Buy Now
Questions 24

There is a request for approved virtual machine applications through a new vSphere platform’s integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations.

The platform has the following characteristics:

  • vRealize Operations is being used to monitor all clusters.
  • There is a dedicated ESXi cluster, supporting all management services.

There is a dedicated ESXi cluster for all line-of-business applications.

  • Network traffic is serviced by NSX-T.

There is a dedicated ESXi cluster for virtual desktop infrastructure (VDI).

  • Network traffic is serviced by NSX-T.

The application owner is requesting approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard.

Which additional non-functional requirement should the architect include in the design to support the new service?

Options:

A.

The vSphere hosting platform and all PCI application virtual machines must be assessed against Payment Card Industry (PCI) Data Security Standard compliance.

B.

The vSphere hosting platform and all PCI application virtual machines must be assessed for SOX compliance.

C.

The vSphere hosting platform and all PCI application virtual machine network traffic must be routed via NSX-T.

D.

The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.

Buy Now
Questions 25

An architect is tasked with planning the design of a new vSphere environment. When commissioned, this environment will be used to migrate an existing set of virtual machines.

An inventory of the existing infrastructure, including configured vCPU, RAM and storage sizes has been provided.

In order for each virtual machine to be migrated, which two data sources with peak and average utilization data are required for sizing? (Choose two.)

Options:

A.

%Ready

B.

Disk Write latency

C.

CPU

D.

Ballooned memory

E.

IOPS

Buy Now
Questions 26

A new real-time financial service application is being developed by the engineering team at a financial firm and will be released as a public Software-as-a-Service (SaaS) offering. The solutions architect has designed and deployed a new vSphere environment and the supporting network infrastructure for hosting all public services. ESXi hosts are configured to use Precision Time Proalhazi@1tocol (PTP) and a local stratum-1 network time server.

Application provisioning and scaling will be managed by VMware vRealize Automation and can be run on Microsoft Windows or multiple distributions of Linux.

Which three recommendations should the architect include in the design to ensure that the service maintain timekeeping within an accuracy of one second? (Choose three.)

Options:

A.

Use Microsoft Windows Server as the guest operating system.

B.

Configure the chrony time-sync agent on each virtual machine guest operating system.

C.

Set the virtual hardware device to use Host System Time (NTP) for each virtual machine running the application.

D.

Add a precision clock virtual device to each virtual machine running the application.

E.

Use a Linux distribution as the guest operating system.

F.

Add a virtual watchdog timer (VWDT) device to each virtual machine running the application.

Exam Code: 3V0-21.21
Exam Name: Advanced Design VMware vSphere 7.x
Last Update: Nov 23, 2024
Questions: 88

PDF + Testing Engine

$134.99

Testing Engine

$99.99

PDF (Q&A)

$84.99